Zoneomics Logo
search icon

Herndon City Zoning Code

ARTICLE II

ZONING DISTRICTS

Sec. 78-20.- Zoning districts.

The following sections provide general provisions for zoning districts and the zoning map.

(Ord. No. 17-O-13, 8-8-2017)

Sec. 78-20.1. - Establishment of base zoning districts.

The base zoning districts established in this chapter are shown in Table 78-20.1: Base Zoning Districts.

TABLE 78-20.1: BASE ZONING DISTRICTS
AbbreviationDistrict Name
Residential Districts
R-15 District Residential Single-Family - 15 District
R-10 District Residential Single-Family - 10 District
RTC District Residential Townhouse Cluster District
RM Residential Multi-Family
Business Districts
CC District Central Commercial District
CS District Commercial Services District
CO District Commercial Office District
O & LI District Office and Light Industrial District
Planned Development Districts
PD-R Planned Development - Residential
PD-B Planned Development - Business
PD-W Planned Development - Worldgate
PD-D Planned Development - Downtown
PD-TD Planned Development - Traditional Downtown
PD-TOC Planned Development - Transit Oriented Core
PD-UR Planned Development - Urban Residential
PD-TRG1 Planned Development - Transit Related Growth Mixed Use, Medium Density Residential, and Office
PD-TRG2 Planned Development - Transit Related Growth Low Density Residential and Low-Impact Commercial

 

(Ord. No. 17-O-13, 8-8-2017; Ord. No. 25-O-13, § 1, 8-12-2025)

Sec. 78-20.2. - Establishment of overlay zoning districts.

The overlay zoning districts established in this chapter are shown in Table 78-20.2: Overlay Zoning Districts.

TABLE 78-20.2: OVERLAY ZONING DISTRICTS
AbbreviationsDistrict Name
FPO Floodplain Overlay
HDO Historic District Overlay
CBPAO Chesapeake Bay Preservation Area Overlay

 

(Ord. No. 17-O-13, 8-8-2017; Ord. No. 20-O-61, § 1, 11-17-2020)

Sec. 78-20.3. - Relationship of base districts to overlay zoning districts.

Three overlay districts are established in addition to the base zoning districts: The Floodplain Overlay (FPO), the Historic District Overlay (HDO), and the Chesapeake Bay Preservation Area Overlay (CBPAO). Where land is classified into an overlay district as well as a base zoning district, the regulations governing development in the overlay district shall apply in addition to the regulations governing development in the underlying base zoning district. In the event of an express conflict, as determined by the zoning administrator, between the standards governing an underlying base zoning district and those governing an overlay district, the standards governing the overlay district shall control.

(Ord. No. 17-O-13, 8-8-2017; Ord. No. 20-O-61, § 1, 11-17-2020)

Sec. 78-20.4. - Official zoning map.

(a)

District boundaries. The official zoning map designates the location and boundaries of the various zoning districts established in this chapter within the town. The official zoning map shall be kept on file in the zoning administrator's office and shall be available for public inspection during normal business hours.

(b)

Incorporated by reference. The official zoning map and all the notations on it are, by this provision, incorporated by reference and made part of this chapter.

(c)

Boundary lines. Unless otherwise specified, zoning district boundary lines are lot lines or the centerlines of streets, alleys, or such lines extended, fixed by dimensions, or otherwise clearly shown or described. The zoning administrator shall interpret zoning district boundaries pursuant to section 78-155.6(e), determination requests. In any case in which a street serves as the boundary between an area zoned for residential use and an area zoned for another use, then the centerline of that street shall be considered as the boundary between the area zoned for residential use and the area zoned for another use.

(d)

Changes to boundaries. Changes made in zoning district boundaries or other matters portrayed on the official zoning map shall be made in accordance with the provisions of this chapter, including section 78-155.1, zoning map amendment. The zoning administrator shall enter changes approved by the town council on the official zoning map at least annually.

(Ord. No. 17-O-13, 8-8-2017)

Sec. 78-20.5. - Transition to new zoning districts.

Upon adoption of this chapter, land that was zoned within a zoning district classification existing prior to July 1, 2006, shall be classified within one of the zoning district classifications set forth in Article II, Zoning Districts, and as shown in Table 78-20.5, Transition to New Zoning Districts. The following table summarizes the transition from former zoning ordinance districts to new districts set forth in this chapter.

TABLE 78-20.5: TRANSITION TO NEW ZONING DISTRICTS
Old Zoning DistrictsNew Zoning Districts
Residential:
Residential (RE-0.5) Residential (R-15)
Residential (R-15)
Residential (R-10) Residential (R-10)
Townhouse Cluster Residential (RTC-10) Residential Townhouse Cluster (RTC)
Townhouse Cluster Residential (RTC-5)
Garden Court Dwelling (R-GC) [combined with PD-R]
Multiple-Family Residential District (RM-1) Residential Multi-Family (RM)
Multiple-Family Residential District (RM-2)
Commercial and Industrial:
Neighborhood Commercial (C1) Commercial Service (CS)
Highway Commercial Corridor (C2)
Commercial Service (C3)
Central Commercial (CC) Central Commercial (CC)
Commercial Offices (CO) Commercial Offices (CO)
Industrial Office (IO) Office and Light Industry (O&LI)
Industrial Park (IP)
Industrial Medium (IM)
Industrial General (IG)
Planned Development:
Residential Planned Community (RPC) Planned Development - Residential (PD-R)
Planned Development Housing (PD-H)
Planned Development - Shopping Centers (PD-SC) Planned Development - Business (PD-B)
Planned Development - Industrial Park(PD-IP)
Planned Development - Commercial (PD-C) Planned Development -Worldgate (PD-W)
Planned Development Mixed Use (PD-MU) Planned Development - Downtown (PD-D)
Overlay Districts:
Floodplain Overlay (FPO) Floodplain Overlay (FPO)
Historic District Overlay (HDO) Historic District Overlay (HDO)
Chesapeake Bay Preservation Area Overlay (CBPAO) Chesapeake Bay Preservation Area Overlay (CBPAO)

 

(Ord. No. 17-O-13, 8-8-2017; Ord. No. 20-O-61, § 1, 11-17-2020)

Sec. 78-20.6. - Annexed land.

Any area annexed by the town after the effective date of this chapter shall immediately upon the effective date of such annexation be, and remain until further legislative act of the town council under authority of this section and of this chapter, classified as its former county zoning district including any proffered conditions, special exceptions, variances, or other zoning attributes or zoning elements. The planning commission shall prepare and present to the town council a zoning plan of the annexed area within one year after the effective date of the annexation.

(Ord. No. 17-O-13, 8-8-2017)

Sec. 78-21. - General provisions for all zoning districts.

(a)

Uses. Principal permitted and allowed uses for all parcels are listed in individual zoning district regulations in Article III, Residential Districts, Article IV, Business Districts, and Article V, Planned Development Districts, and summarized in section 78-70.2(d): Table of Principal Permitted and Allowed Uses.

(b)

Dimensional standards. Any land that is developed, used, or occupied shall meet the minimum lot area, width, coverage, setback, yard, structure height and other requirements set forth in Article III, Residential Districts, Article IV, Business Districts, and Article V, Planned Development Districts, for the zoning district in which it is located, except as otherwise established in this chapter for particular uses.

(c)

Lot requirements. The following provisions apply in all lots in all zoning districts:

(1)

Number of principal structures. There shall be no more than one primary or principal structure, plus permitted accessory structures, per lot or tract of land, except in the multi-family, planned development or business districts subject to the provisions of this chapter. To qualify as part of a single primary structure, a structure must be structurally linked to the rest of the primary structure.

(2)

Double frontage lots. On double frontage lots, the front setback requirement shall be met on all street frontages of the property.

(3)

Corner lots. On corner lots, the front setback requirement shall be met on all street frontages. Side and rear yard requirements shall be determined by the zoning administrator based upon both the orientation of the lot and upon the orientation of structures built or to be built on the lot. On any corner lot planting, structures, fences, retaining walls, or other features more than three feet higher than the curb level are subject to the provisions of section 78-21(e), visibility clearance.

(d)

Common areas. Common areas shall be established and maintained as described in Article XI, Development Standards. Common area not contained in lots and streets shall not be denuded, defaced or otherwise disturbed in any manner other than for maintenance except in accordance with the approved site plan or subdivision plan for the site.

(e)

Visibility clearance. The following visibility standards apply in all districts.

(1)

Fences, walls and shrubs of three feet or more. Fences, walls, trees, shrubs, or other visual barriers over three feet in height above grade shall be placed in such a manner as to enable and ensure the ongoing the view of pedestrians on the sidewalk and traffic vision at intersections.

(2)

Intersecting streets. For intersecting streets, the public works director shall determine the visibility clearance requirement based upon accepted engineering standards for requiring adequate sight distance.

(3)

Driveways or alleys. For a driveway or alley intersecting a street, no visual obstruction over three feet in height above grade shall be permitted within the 25 feet sight distance triangle created at the intersection of an alley and street. The triangle is measured from a point where the curb line and the center line of the alley meet. The distance from this point shall be 25 feet along the street curb line ("B") and 25 feet along the alley center line ("A"). The third side of the triangle ("C") connects these two sides, creating the sight distance triangle. Similarly, no visual obstruction over three feet in height above grade shall be permitted within the six feet sight distance triangle created at the intersection of a garage entrance and alley. The following diagram illustrates the site distance triangle.

Site Distance Triangle Illustration

Site Distance Triangle Illustration

(f)

Accessory features and structures allowed within required setbacks and yards in all districts. The buildings or structures on a lot shall not be located in whole or in part within a required setback or yard in any zoning district, except in the case of certain features appurtenant to a principal structure or use. Table 78-21(f): Features Allowed within Required Setbacks and Yards, lists features that may be located within any required setbacks or yards, subject to specific limitations, which may include zoning district specific provisions, noted within the table and the following:

(1)

Public safety and circulation. Any features allowed within required setbacks and yards shall not interfere with safe use of the public street or sidewalk or otherwise interfere with public safety and circulation.

(2)

Landscaping. Landscape features (such as trees, walls, shrubs, fences, flowers, or other plants) shall not produce a hedge effect higher than four feet in any front setback or higher than seven feet in a required rear or side yard.

(3)

Table. Table 78-21(f): Features Allowed within Required Setbacks and Yards, lists features that may be located within any required setbacks or yards, subject to specific limitations, which may include zoning district specific provisions. [Formerly section 78-300.4(b)(3)]

TABLE 78-21(f).: FEATURES ALLOWED WITHIN REQUIRED SETBACKS AND YARDS
FEATURES THAT MAY
ENCROACH INTO
SETBACK OR YARD
(subject to applicable Building Code requirements)
LIMITATION
Trees, Shrubs, Flowers, Hedges, and Other Landscape Features May be planted within a required setback or yard.
Driveways and Parking Areas See "Parking in Residential Districts" in section 78-100.9(b)
Chimney, Eaves, Trim, Fascia Boards, Sills, Cornices, Bay Windows May extend up to two feet into any required setback or yard as long as the total area of the bay window extending into the required setback or yard does not exceed 25 percent of the total length of the affected setback or yard.
Stoops, Uncovered Porches, Uncovered Steps or Stairs, Balconies on Second Stories or above and Similar Architectural Features of the Principal Structure • May extend up to 4 feet into a required setback or yard, as long as no portion of the feature is located within 5 feet of any property line for such features attached to a single-family detached structure.
• No portion of the projection may be closer than one foot to any side lot line for such features attached to a dwelling other than a single-family detached dwelling.
Decks (including associated steps and appurtenant features located more than two feet above grade) • May extend up to 12 feet into any required rear yard, provided no portion of the projection, including stairs, is located closer to the rear lot line than ½ the distance measured from the rear lot line to the closest point of the dwelling.
• Shall not have a floor higher than 12 feet above grade where it connects to the dwelling.
• No portion of the deck, including stairs, is located closer than 10 feet to any side lot line when attached or adjacent to a single-family detached structure or closer than one foot to any side lot line when attached or adjacent to any dwelling other than a single-family detached structure.
• The deck shall not have a roof.
Patios, Retaining Walls, Terraces, and Similar Features (other than decks located more than two feet above grade) May extend into a required side or rear yard, as long as no portion of the feature is located within two feet of any property line. Retaining walls are subject to the provisions of section 78-115.1: Retaining Walls.
Fences or Walls (up to and including 4 feet in height) May be located within a required setback or yard, subject to the provisions of section 78-115.2: Fencing, Walls and Hedges.
Fences or walls over 4 feet and not more than 7 feet in height • May be located within a required rear or side yard but shall not extend forward of the architectural front of the principal structure or be located between any portion of the architectural front of the principal structure and the required front setback except as permitted by section 78-115.2(j), Perimeter Fences and Walls for Residential Development.
• May be located in any secondary front setback on a residential lot that has frontage on more than one street with the granting of an administrative adjustment subject to the provisions of section 78-115.2: Fencing, Walls and Hedges, and section 78-115.5: Administrative Adjustments.
Open mesh (including chain link) Fences up to and in excess of four feet in height Enclosing Recreational Facility School Uses, or On-going Construction. May be located within a required setback or yard, and subject to the provisions of section 78-115.2: Fencing, Walls and Hedges
Accessory Structures for Residential Uses in any Residential Zoning District. May be located in a required rear yard as long as it is not closer than five feet to any alley line or two feet to any side or rear lot line. See also section 78-80.3(a).
Accessory Structures for Nonresidential Uses in any Residential Zoning District. Shall be located no less than ten feet from the side or rear property line.
Additions Including Associated Steps or Appurtenant Features on any Single-family Detached Dwelling • May extend up to 12 feet into a required rear yard in the R-10 and R-15 district on having a rear yard 25 or more feet in depth.
• May extend up to 12 feet into a required rear yard in the PD-R district on lots having a rear yard 25 or more feet in depth.
• The length of such rear addition shall not in any case exceed 1/3 of the horizontal linear measurement across the entire rear facade of the principal dwelling unit or 15 feet in length, whichever is more.
• Such rear addition shall not in any case exceed 14 feet in height measured from the floor of the main living level featuring kitchen, dining, and living room areas.
• Such rear addition shall not in any case extend into a rear yard without meeting these standards as applicable.
• May extend up to eight feet into a front setback in the R-10 and R-15 district on lots having a front yard of 35 feet or more in depth. Uncovered steps may extend for an additional four feet into a front setback.
• May extend up to eight feet into a front setback in the PD-R district on lots having a front yard of 35 or more feet in depth. Uncovered steps may extend for an additional four feet into a front setback
• Such front addition shall not have any portion of its structure extend above the eave of the primary roof of the existing structure.
• Such front addition shall not in any case exceed 10 feet in length.
• Such front addition shall not in any case extend into a required side yard.
• No property shall have more than one addition approved under this provision
• Open porch additions only may extend the full length of the front elevation. Such open porch additions shall be no closer to any adjacent side lot line than a distance equal to the minimum required rear side yard for the residential zoning district in which it is located.
>Wheelchair Ramps A wheelchair ramp may extend into any minimum required yard when it is a retrofit for an existing principal dwelling; and necessary for a person with a disability/special need.
Residential Community Perimeter (fences up to and including 6 feet in height) May be located on residential common area within 20 feet of the public right-of-way subject to the provisions of section 78-115.2: Fencing, Walls and Hedges.

 

(Ord. No. 17-O-13, 8-8-2017)