A Conditional Use Permit may be granted to authorize any use not involving a significant investment in buildings or structures, for a period of time not exceeding five years. At the time of development of the property, the property shall be required to develop according to a specific plan which treats the property as an integrated whole and, at a minimum, includes permitted uses, detailed land use map, circulation standards and design standards. Adequate protection measures, such as buffer zones, will be required for properties adjacent to environmentally sensitive areas.
(Ord. 601 § 1, 1983; Ord. 94-884)