35
Regulation | Definition | Requirement | Notes/Additional Requirements |
|---|---|---|---|
Minimum lot area | Minimum area of building site (includes public access easements) | 2 acres | |
Minimum lot dimensions | Minimum size of a lot calculated using lot lines | 150 feet width 150 feet depth | |
Minimum setback at street | Minimum linear feet building can be sited from property line adjacent to street. | 20 feet | Setbacks shall be measured from the property line. In instances where there will be a public access easement for vehicles, measure the setback from the back of the easement. For projects with public access easements in the form of private streets internal to the project site, this minimum setback shall apply. |
Minimum interior side and rear setbacks | Minimum linear feet building can be sited from interior and rear property lines. | 20 feet | Minimum 10-foot deep landscape planting zone required along interior and rear property lines. |
Maximum nonresidential floor area ratio (FAR) | Maximum permitted ratio of nonresidential gross floor area on a lot to the square footage of the lot | 50% | |
Residential density | The number of dwelling units in an acre. | 12 du/acre to 30 du/acre | |
Maximum residential floor area ratio | Maximum permitted ratio of residential gross floor area on a lot to the square footage of the lot | 40% to 100% | Floor area ratio shall increase on an even gradient from 40% for 12 du/ac to 100% for 30 du/ac. |
Height | Height does not include roof-mounted equipment and utilities | Nonresidential structures: 35 feet Mixed nonresidential and residential structures or residential structures: 40 feet | A parapet used to screen mechanical equipment is not included in the height. Maximum height of mechanical equipment with screening is 14 feet and must be set back a minimum 15 feet from building façade. If less than 15 feet from façade, maximum height is 4 feet and screening required. Stairs and elevators towers may exceed the height by 14 feet. Architectural features, e.g. towers, turrets, trellises/sun shades, and similar features, including at building modulations may exceed height by up to 10 feet subject to not exceeding 10 percent of roof area. Roof top elements shall be integrated with building design. |
Minimum open space requirement | Minimum portion of the building site open and unobstructed by fully enclosed buildings. | 30% | See Section 16.35.080 for open space requirements. |
Land Use | Maximum Spaces1 (Per 1,000 Sq. Ft or dwelling unit.) | Minimum Bicycle Parking2 |
|---|---|---|
Residential | 1 | 1.5 long-term per dwelling unit; 10% additional short-term for guests 1 per 5,000 sq. ft. of gross floor area; Minimum two spaces for Office and Research Development: 80% for long-term2 and 20% for short-term2 For all other commercial uses: 20% for long-term2 and 80% for short-term2 |
Residential with attached garage | 2 | |
Office | 2 | |
Research and Development | 2 | |
Retail | 2.5 | |
Banks and financial institutions | 2.5 | |
Eating and drinking establishments | 2.5 | |
Personal services | 2.5 | |
Private recreation | 2.5 | |
Child care center | 2.5 | |
Public parking lot or structure | One space per 20 vehicle spaces | |
Other | At public works director or designee's discretion | At public works director or designee's discretion |
1 | The Administrative, Professional and Research, Special district is only applicable to parcels and project sites predominantly within one-half mile of a major transit stop as defined in California Public Resources Code section 21064.3. In Menlo Park, a major transit stop means an existing rail transit station or the intersection of two or more major bus routes with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute periods. A project site that qualifies as a TOD would be exempt from the city's minimum parking requirement per the requirements of Assembly Bill (AB) 2097. |
2 | Long-term parking is for use over several hours or overnight, typically used by employees and residents. Short-term parking is considered visitor parking for use from several minutes to up to a couple of hours. |
TABLE 16.35.110(2)(B) GREEN BUILDING REQUIREMENTS | ||||||
|---|---|---|---|---|---|---|
NEW CONSTRUCTION | ADDITIONS AND/OR ALTERATIONS | |||||
Green Building Requirement | 10,000 sq. ft. – 25,000 sq. ft. | 25,001 sq. ft. – 100,000 sq. ft. | 100,001 sq. ft. and above | 1 sq. ft. – 9,999 sq. ft. of conditioned area, volume or size | 10,000 sq. ft. – 25,000 sq. ft. of conditioned area, volume or size3 | 25,001 sq. ft. and above of conditioned area, volume or size3 |
Green Building | Certified LEED Silver BD+C1 | Certified LEED Silver BD+C1 | Certified LEED Gold BD+C1 | CAL Green mandatory | Certified LEED Silver ID+C1 or update core and shell of entire building to current California Energy Code2 and meet Section 16.35.110(2)(B) | Certified LEED Gold ID+C1 or update core and shell of entire building to current California Energy Code2 and meet Section 16.35.110(2)(B) |
Electric Vehicle (EV) Charging Spaces | The electric vehicle charging spaces requirements in Section 16.72.010 apply. | |||||
Energy Reporting | Enroll in EPA Energy Star Building Portfolio Manager and submit documentation of compliance as required by the city | Enroll in EPA Energy Star Building Portfolio Manager and submit documentation of compliance as required by the city | Enroll in EPA Energy Star Building Portfolio Manager and submit documentation of compliance as required by the city | Enroll in EPA Energy Star Building Portfolio Manager and submit documentation of compliance as required by the city | Enroll in EPA Energy Star Building Portfolio Manager and submit documentation of compliance as required by the city | Enroll in EPA Energy Star Building Portfolio Manager and submit documentation of compliance as required by the city |
1 Applicable projects are required to be LEED certified: (a) applicant must submit appropriate LEED checklist and verifying cover letter from a project LEED AP with the project application; and (b) applicant must complete all applicable LEED certification documents prior to approval of the final inspection. The community development director may authorize the use of an alternate LEED rating system based on substantial evidence that the alternate LEED rating system is more appropriate for the proposed project. |
2 Building owners may choose to have additions and/or alterations follow the LEED ID+C path, or alternatively, building owners may upgrade the entire existing building's core and shall to the current California Energy Code standards and follow the city's requirements listed in Section 16.35.110(2)(B). If the building owner chooses to upgrade the entire building's core and shell to current California Energy Code standards, additions and alterations of that building will be exempt from the LEED ID+C requirement for three code update cycles beginning with the upgrade cycle and ending with the two cycles following the upgrade cycle. If this option is selected by the applicant, the building owner must upgrade to the Energy Code in effect at the time of the first building permit application for interior alteration and/or additions. Building permits for the core and shell upgrade must be initiated and satisfactory progress must be made on the core and shell upgrade project before occupancy for the additions and/or alterations shall be granted by the city's building department. If the building owner fails to complete these core and shell upgrades within one year of permit initiation, or receive a written letter from the community development director or his/her designee extending the deadline, the building owner shall be subject to typical permit violation penalties, including but not limited to stop work orders on any construction on the subject property, fines, and legal action. |
3 If over a period of five years (or 60 months) the subject property makes smaller additions and/or alterations that cumulatively equal or exceed the trigger square footage listed above (i.e., 10,000 square feet or 25,001 square feet), the subject property shall be required to comply with the green and sustainable building requirements of this table. |