40 C-MU NEIGHBORHOOD MIXED USE DISTRICT
Land Use | Minimum Spaces (Per Unit or 1,000 Sq. Ft.) | Maximum Spaces (Per Unit or 1,000 Sq. Ft.) | Minimum Bicycle Parking1 |
|---|---|---|---|
Residential units | 1 per unit | 1.5 per unit | 1.5 long-term2 per unit; 10% additional short-term2 for guests |
Office | 2 | 3 | 1 per 5,000 sq. ft. of gross floor area Minimum 2 spaces for office and research development: 80% for long-term2 and 20% for short-term2 For all other commercial uses: 20% for long-term2 and 80% for short-term2 |
Retail | 2.5 | 3.3 | |
Financial services | 2 | 3.3 | |
Eating and drinking establishment | 2.5 | 3.3 | |
Personal services | 2 | 3.3 | |
Private recreation | 2 | 3.3 | |
Child care center | 2 | 3.3 | |
Other | At transportation manager discretion | At transportation manager discretion | At transportation manager discretion |
Notes: |
|---|
1 See the latest edition of best practice design standards in Association of Pedestrian and Bicycle Professionals Bicycle Parking Guidelines. |
2 Long-term parking is for use over several hours or overnight, typically used by employees and residents. Short-term parking is considered visitor parking for use from several minutes to up to a couple of hours. |
TABLE 16.40.050(1)(B): RESIDENTIAL GREEN BUILDING REQUIREMENTS | ||||||
|---|---|---|---|---|---|---|
Green Building Requirement | NEW CONSTRUCTION | ADDITIONS AND/OR ALTERATIONS | ||||
10,000 sq. ft.—25,000 sq. ft. | 25,001 sq. ft—100,000 sq. ft. | 100,001 sq. ft. and above | 1 sq. ft—9,999 sq. ft. of conditioned area, volume or size | 10,000 sq. ft—25,000 sq. ft. of conditioned area, volume or size3 | 25,001 sq. ft. and above of conditioned area, volume or size3 | |
Green Building | Designed to meet LEED Silver BD+C1 | Designed to meet LEED Silver BD+C1 | Designed to meet LEED Gold BD+C1 | CALGreen mandatory | Designed to meet LEED Silver ID+C1 or update core and shell of entire building to current California Energy Code2 and meet subsection (2)(B) of this section | Designed to meet LEED Gold ID+C1 or update core and shell of entire building to current California Energy Code2 and meet subsection (2)(B) of this section |
Electric Vehicle (EV) Charging Spaces | The electric vehicle charging spaces requirements in Section 16.72.010 apply. | |||||
Energy Reporting | Enroll in EPA Energy Star Building Portfolio Manager and submit documentation of compliance as required by the city | |||||
Notes: |
|---|
1 "Designed to meet LEED standards" is defined as follows: (a) applicant must submit appropriate LEED checklist and verifying cover letter from a project LEED AP with the project application and (b) applicant must complete all applicable LEED certification documents prior to approval of the final inspection for the building permit to be reviewed either for LEED certification, or for verification by a third party approved by the city for which the applicant will pay for review and/or certification. |
2 Building owners may choose to have additions and/or alterations follow the LEED ID+C path or, alternatively, building owners may upgrade the entire existing building's core and shell to the current California Energy Code standards and follow the city's requirements listed in subsection (2)(B) of this section. If the building owner chooses to upgrade the entire building's core and shell to current California Energy Code standards and follow the city's requirements listed in subsection (2)(B) of this section, additions and alterations of that building will be exempt from the LEED ID+C requirement for three (3) code update cycles beginning with the upgrade cycle and ending with the two (2) cycles following the upgrade cycle. If this option is selected by the applicant, the building owner must upgrade to the Energy Code in effect at the time of the first building permit application for interior alteration and/or additions. Building permits for the core and shell upgrade must be initiated and satisfactory progress must be made on the core and shell upgrade project before occupancy for the additions and/or alterations shall be granted by the city's building department. If the building owner fails to complete these core and shell upgrades within one (1) year of permit initiation, or receive a written letter from the community development director or his/her designee extending the deadline, the building owner shall be subject to typical permit violation penalties, including but not limited to stop work orders on any construction on the subject property, fines, and legal action. |
3 If over a period of five (5) years (or sixty (60) months) the subject property makes smaller additions and/or alterations that cumulatively equal or exceed the trigger square footage listed above (i.e., ten thousand (10,000) square feet or twenty-five thousand one (25,001) square feet), the subject property shall be required to comply with the green and sustainable building requirements of this table. |
40 C-MU NEIGHBORHOOD MIXED USE DISTRICT
Land Use | Minimum Spaces (Per Unit or 1,000 Sq. Ft.) | Maximum Spaces (Per Unit or 1,000 Sq. Ft.) | Minimum Bicycle Parking1 |
|---|---|---|---|
Residential units | 1 per unit | 1.5 per unit | 1.5 long-term2 per unit; 10% additional short-term2 for guests |
Office | 2 | 3 | 1 per 5,000 sq. ft. of gross floor area Minimum 2 spaces for office and research development: 80% for long-term2 and 20% for short-term2 For all other commercial uses: 20% for long-term2 and 80% for short-term2 |
Retail | 2.5 | 3.3 | |
Financial services | 2 | 3.3 | |
Eating and drinking establishment | 2.5 | 3.3 | |
Personal services | 2 | 3.3 | |
Private recreation | 2 | 3.3 | |
Child care center | 2 | 3.3 | |
Other | At transportation manager discretion | At transportation manager discretion | At transportation manager discretion |
Notes: |
|---|
1 See the latest edition of best practice design standards in Association of Pedestrian and Bicycle Professionals Bicycle Parking Guidelines. |
2 Long-term parking is for use over several hours or overnight, typically used by employees and residents. Short-term parking is considered visitor parking for use from several minutes to up to a couple of hours. |
TABLE 16.40.050(1)(B): RESIDENTIAL GREEN BUILDING REQUIREMENTS | ||||||
|---|---|---|---|---|---|---|
Green Building Requirement | NEW CONSTRUCTION | ADDITIONS AND/OR ALTERATIONS | ||||
10,000 sq. ft.—25,000 sq. ft. | 25,001 sq. ft—100,000 sq. ft. | 100,001 sq. ft. and above | 1 sq. ft—9,999 sq. ft. of conditioned area, volume or size | 10,000 sq. ft—25,000 sq. ft. of conditioned area, volume or size3 | 25,001 sq. ft. and above of conditioned area, volume or size3 | |
Green Building | Designed to meet LEED Silver BD+C1 | Designed to meet LEED Silver BD+C1 | Designed to meet LEED Gold BD+C1 | CALGreen mandatory | Designed to meet LEED Silver ID+C1 or update core and shell of entire building to current California Energy Code2 and meet subsection (2)(B) of this section | Designed to meet LEED Gold ID+C1 or update core and shell of entire building to current California Energy Code2 and meet subsection (2)(B) of this section |
Electric Vehicle (EV) Charging Spaces | The electric vehicle charging spaces requirements in Section 16.72.010 apply. | |||||
Energy Reporting | Enroll in EPA Energy Star Building Portfolio Manager and submit documentation of compliance as required by the city | |||||
Notes: |
|---|
1 "Designed to meet LEED standards" is defined as follows: (a) applicant must submit appropriate LEED checklist and verifying cover letter from a project LEED AP with the project application and (b) applicant must complete all applicable LEED certification documents prior to approval of the final inspection for the building permit to be reviewed either for LEED certification, or for verification by a third party approved by the city for which the applicant will pay for review and/or certification. |
2 Building owners may choose to have additions and/or alterations follow the LEED ID+C path or, alternatively, building owners may upgrade the entire existing building's core and shell to the current California Energy Code standards and follow the city's requirements listed in subsection (2)(B) of this section. If the building owner chooses to upgrade the entire building's core and shell to current California Energy Code standards and follow the city's requirements listed in subsection (2)(B) of this section, additions and alterations of that building will be exempt from the LEED ID+C requirement for three (3) code update cycles beginning with the upgrade cycle and ending with the two (2) cycles following the upgrade cycle. If this option is selected by the applicant, the building owner must upgrade to the Energy Code in effect at the time of the first building permit application for interior alteration and/or additions. Building permits for the core and shell upgrade must be initiated and satisfactory progress must be made on the core and shell upgrade project before occupancy for the additions and/or alterations shall be granted by the city's building department. If the building owner fails to complete these core and shell upgrades within one (1) year of permit initiation, or receive a written letter from the community development director or his/her designee extending the deadline, the building owner shall be subject to typical permit violation penalties, including but not limited to stop work orders on any construction on the subject property, fines, and legal action. |
3 If over a period of five (5) years (or sixty (60) months) the subject property makes smaller additions and/or alterations that cumulatively equal or exceed the trigger square footage listed above (i.e., ten thousand (10,000) square feet or twenty-five thousand one (25,001) square feet), the subject property shall be required to comply with the green and sustainable building requirements of this table. |