Any construction or alteration upon any lot that results in an increase of impervious surface on such lot equal to or greater than 200 square feet must include facilities for on-site retention and discharge of stormwater runoff from the added area of impervious surface. If the added impervious surface is constructed in separate locations, such that connecting those separate areas of increased impervious surface to a single retention system is impractical, then facilities for the on-site retention and discharge of the additional stormwater may be connected to existing areas of impervious surface, rather than to the newly constructed portions.