Zoneomics Logo
search icon

Bluffdale City Zoning Code

11.40 PERMIT

REQUIREMENTS

11.40.010 Building Permits And Plats Required

  1. Permit Required: No building or structure shall be constructed, reconstructed, altered or moved, nor shall the use of land be changed, except after the issuance of a permit by the city.
  2. Uncertain Boundaries; Plat Required: If property boundaries are in any way uncertain, applications for building permits shall be accompanied by a plat, drawn to scale, showing the actual dimensions of the lot to be built on, the size and location of existing and proposed buildings, and any other information needed to make a well informed decision.
  3. Other Required Documents: The staff, planning commission or city council may require, at the applicant's expense, a legal description, professional survey, title search showing ownership, contour map, and any other information deemed necessary to enforce the terms of this title. (Ord. 10-24-00-1, 10-24-2000)
HISTORY
Amended by Ord. 10-24-00-1 on 10/24/2000

11.40.020 Permits To Comply With Land Use Standards

No permit shall be issued or granted for the construction or alteration of any building or structure, the moving of any building onto a lot or parcel, a change in the use of a building or structure, or for a change in the use of land if the construction, alteration, moving or change in use would result in a violation of any provision of this title. Further, no sewer, water or electrical utility facilities shall be installed to serve any premises if any use of the lot or parcel will be in violation of this title. (Ord. 10-24-00-1, 10-24-2000)

HISTORY
Amended by Ord. 10-24-00-1 on 10/24/2000

11.40.030 Certificate Of Occupancy And Land Use Compliance

  1. Required: It shall be unlawful to use or occupy any building, structure or parcel of land until a certificate of occupancy has been issued for the building, structure or parcel. It shall also be unlawful to allow any use that is not consistent with the requirements of this title following the issuance of a certificate of occupancy.
  2. Information Required: The certificate of occupancy may be issued upon completion of all the requirements of this title and any and all other laws and ordinances recognized by the city and a final inspection of the building, structure or parcel by the staff. The information required for issuance of a certificate of occupancy includes, but is not limited to:
    1. Residential Buildings Or Structures:
      1. The number of residential units in each building.
      2. The number, if any, of potential tenants or renters anticipated to reside in each building.
      3. The number of legal sized off street parking spaces being provided on the premises.
      4. A signature of the owner of the building stating that the information is accurate and will be maintained at all times unless otherwise approved.
    2. Commercial, Industrial And Institutional Certificates:
      1. The proposed number of employees.
      2. The number of legal sized off street parking spaces being provided on the premises for both employees and visitors.
      3. The square footage of each building and the type of occupancy or the percentage of the building used for each type of occupancy.
      4. A signature of the owner of the building stating that the information is accurate and will be maintained at all times unless otherwise approved. (Ord. 10-24-00-1, 10-24-2000)
  3. Failure To Obtain; Penalty: Failure to obtain a certificate of occupancy, or changing the intensity of use or number of occupants, shall be a class C misdemeanor and, upon conviction, subject to penalty as provided in section 1-4-1 of this code. Occupation of any building for which there is no certificate of occupancy shall be declared to be a nuisance and shall be abated as such. (Ord. 10-24-00-1, 10-24-2000; amd. 2013 Code)
HISTORY
Amended by Ord. 10-24-00-1 on 10/24/2000

11.40.040 Assurance For Improvements

  1. Guarantee: The city council shall require the applicant to post an acceptable guarantee at the time of approval of any improvements regulated by this title. The amount, estimated by the city engineer and approved by the city council, shall be sufficient to assure to the municipality the satisfactory construction, installation and dedication of the uncompleted portion of required improvements. The amount of the guarantee shall be equal to one hundred twenty percent (120%) of the estimated cost of the required improvements as determined by the city engineer.
  2. Scope Of Guarantee; Form: The posting of guarantees are in lieu of the actual construction and are therefor established for the benefit of and to ensure to the public at large that the work will be properly completed. As such, they are not to be used for satisfying contractor or mechanics' liens or other unrelated obligations. The performance guarantee shall comply with all statutory requirements and shall be satisfactory to the city attorney as to form, sufficiency and manner of execution as set forth by the city attorney.
  3. Time Period For Completion; Extension: The period within which required improvements must be completed shall be specified by the city council upon approval and shall be incorporated in the guarantee and shall not exceed one year from the date of approval. The city council may, given a valid reason, extend the completion date set forth in such guarantee for a maximum period of one additional year. The city council may at any time during the period of such guarantee accept a substitution of principal or sureties. (Ord. 10-24-00-1, 10-24-2000)
HISTORY
Amended by Ord. 10-24-00-1 on 10/24/2000

11.40.050 Enforcement; Violations

The city council hereby declares that:

  1. Permit Required: It shall be unlawful to erect, construct, reconstruct, alter or change the use of any building or other structure within the city covered by these regulations without obtaining a building permit from the city.
  2. Issuance Prohibited Without Conformance: The city shall not issue any permit unless the plans for the proposed erection, construction or use fully conforms to the regulations then in effect. (Ord. 10-24-00-1, 10-24-2000)
HISTORY
Amended by Ord. 10-24-00-1 on 10/24/2000

10-24-00-1