STORMWATER AND FLOODPLAINS1
Editor's note— Ord. No. 11-2019, § 2, adopted June 17, 2019, in effect, repealed ch. 14, §§ 14.01—14.09 and enacted a new ch. 14 as set out herein. Former ch. 14 pertained to similar subject matter and derived from Ord. No. 04-2019, adopted January 16, 2018.
There is hereby adopted by the City for the purpose of promoting effective, equitable and acceptable stormwater and floodplain management measures that certain ordinance known as the "DuPage Countywide Stormwater and Floodplain Ordinance," as periodically amended and available from the County, of which not less than three copies have been and are now filed in the office of the City Clerk, and the whole thereof as if set out at length herein except as modified in this Chapter, shall be controlling in the regulation and management of stormwater and floodplains as defined in said County Stormwater Ordinance.
(Ord. No. 04-2018, § 3, 1-16-2018; Ord. No. 11-2019, § 2, 6-17-2019)
(a)
Site runoff storage (i.e. stormwater detention) shall be required in accordance with Article IX of the DuPage County Countywide Stormwater and Floodplain Ordinance except for the following conditions:
(1)
Section 15-72.A.1 of Article IX of the DuPage County Countywide Stormwater and Floodplain Ordinance shall be revised to state as follows: "When comparing the impervious area of the pre-development development site as it existed as of February 15, 1992 to the with-development impervious area of the same development site, excluding any areas of the development site for which detention has already been provided, and the impervious area has not increased by a minimum of five thousand (5,000) square feet cumulatively of permitted development."
(2)
If a development site has added impervious area between February 15, 1992 and January 16, 2018 (the effective date of MCO-04-2018), and the total amount of net new impervious during that time period is less than twenty-five thousand (25,000) square feet, then new site runoff storage in accordance with Section 15-72.A.1 of Article IX of the DuPage County Countywide Stormwater and Floodplain Ordinance shall be triggered once:
a.
The development site adds new impervious area which then takes the site to twenty-five thousand (25,000) square feet or more of cumulatively new impervious area since February 15, 1992; or
b.
The development site adds five thousand (5,000) square feet or greater cumulatively of new impervious area since January 16, 2018 (the effective date of MCO-04-2018).
(b)
Post construction best management practices (PCPMP's) shall be required in accordance with Article VIII of the DuPage County Countywide Stormwater and Floodplain Ordinance except for the following conditions:
(1)
Section 15-63.A.1 of Article VIII of the DuPage County Countywide Stormwater and Floodplain Ordinance shall be deleted as the City of Elmhurst has reduced the threshold for trigging PCBMP's from two thousand five hundred (2,500) to zero (0) square feet of net new impervious.
(2)
When PCBMP's are required according to this Chapter, and the net new impervious is less than five thousand (5,000) square feet, they shall be calculated using the volume calculation provided by the National Resources Conservation Service (NRCS) Runoff Curve Number (CN) method for a twenty-four (24)-hour, one hundred (100)-year rain event (7.58").
(3)
When PCBMP's are required according to this Chapter, and the net new impervious is equal to or greater than five thousand (5,000) square feet, they shall be calculated according to Section 15-64 of Article VIII of the DuPage County Countywide Stormwater and Floodplain Ordinance.
(Ord. No. 04-2018, § 3, 1-16-2018; Ord. No. 11-2019, § 2, 6-17-2019)
(a)
This Section may provide the owner/developer with an alternative to physically providing for detention storage of excess stormwater runoff for the development or improvement. In certain circumstances, the owner or other person proposing development ("owner") shall have the option of paying a fee to the City in lieu of complying with the provisions of this Chapter that require physical detention storage for stormwater. The fee shall be in an amount that is equal to the cost, as estimated by the City, for providing an alternate means of stormwater management ("alternate stormwater management measures") that substantially satisfies the requirements this Chapter. Calculations of such increased amount of stormwater runoff to be caused by the proposed development shall be made on the basis of (and expressed in terms of) an acre-foot of volume, or a fraction thereof. All fees paid to the City under this Section shall be segregated, held, and disbursed only to pay the costs of such alternate stormwater management measures as the City deems appropriate.
(b)
Payment of the stormwater fee (as hereinafter set forth) in lieu of providing detention storage as otherwise required by this Chapter shall be permitted only if the owner and his engineer can substantiate hardship in complying with the detention storage provisions of this Chapter. The City Council, after consideration of the City Engineer's report and recommendation, shall recognize a hardship if, upon evidence presented to the City Council, it makes the following findings of fact:
(1)
The property in question cannot yield a reasonable return if permitted to be used only under the conditions allowed by the stormwater storage provisions of this Chapter;
(2)
Failure to permit paying the stormwater fee in lieu of detention would constitute a hardship to the owner which has not resulted from actions of the owner;
(3)
Payment of the stormwater fee has a beneficial purpose and is otherwise lawful;
(4)
Waiving installation of detention will have no materially adverse effect upon the efficiency of water flow capacity or water detention storage capacity of any floodway or floodplain, as determined by the City Engineer;
(5)
Waiving the installation of detention will not materially increase the probability of potential flood damage either to the subject property or to other properties, as determined by the City Engineer;
(6)
Waiving installation of detention will not alter the essential character of the vicinity.
(c)
No person or property subject to stormwater detention requirements shall be exempt therefrom unless:
(1)
The City Council shall have passed an ordinance approving the payment of the stormwater fee in lieu of providing detention storage; and
(2)
Such fee has in fact been paid to the City.
(d)
(1)
The fee from an owner-developer under this Section shall be calculated at the rate of one hundred thirty-three thousand dollars ($133,000.00) per acre-foot of detention storage ("stormwater fee"). The stormwater fee has been calculated by the City Engineer to be sufficient to compensate the City for total expenses in providing alternate stormwater management measures. This amount shall be considered current at the time of passage of this Chapter.
(2)
From time to time, as frequently as the City may deem it necessary or desirable, the City shall determine and establish the cost to the City of providing the alternate stormwater management measures such cost to include, without limitation, the cost of necessary land acquisition, engineering expenses, legal fees and other related expenditures. The amount so determined and established shall serve as the basis for the calculation of the stormwater fee to be paid, as provided in this Section until such time as a different amount is determined and established by the City Council.
(Ord. No. 04-2018, § 3, 1-16-2018; Ord. No. 11-2019, § 2, 6-17-2019)
Notwithstanding any provision to the contrary in this Chapter or in the DuPage Countywide Stormwater and Floodplain Ordinance aforesaid, floodplains within the City shall be as delineated on the updated flood insurance rate maps and flood insurance study for the DuPage County portion of the City dated August 1, 2019 and the updated flood insurance rate maps and flood insurance study for the Cook County portion of the City, dated August 19, 2008, as prepared and approved by the Federal Emergency Management Agency ("FEMA") of which not less than three copies have been and are now filed in the Office of the City Clerk. The FEMA flood insurance study maps and profiles as set forth on Appendix A are incorporated as part of this section.
APPENDIX A
FEMA FLOOD INSURANCE STUDY MAPS AND PROFILES
(Ord. No. 04-2018, § 3, 1-16-2018; Ord. No. 11-2019, § 2, 6-17-2019)
(a)
Any owner and/or developer of residential property seeking permits from the City of Elmhurst pursuant to the Elmhurst Municipal Code for construction of a new single-family home shall be required to provide stormwater storage volume on such residential property ("Stormwater Storage System") to offset the increase in stormwater runoff volume that may result from such new single-family home construction.
(b)
Any Stormwater Storage System required under this Section to be located on residential property must be designed to a maximum of sixty (60) percent allowable impervious lot coverage of such residential property, or such different maximum allowable impervious lot coverage of residential property under the Elmhurst Municipal Code and/or Elmhurst Zoning Ordinance.
(c)
The stormwater storage volume to be provided for on residential property where a new single-family home is constructed shall be determined using the engineering formula commonly known as the "National Resources Conservation Service (NRCS) Runoff Curve Number (CN) method" applied to the maximum allowable impervious lot coverage for residential property under the Elmhurst Municipal Code and/or the Elmhurst Zoning Ordinance.
(d)
Each residential property where a new single-family home is constructed shall provide the required stormwater storage, if any, in a manner that promotes stormwater infiltration into the ground while also providing volumetric storage using the "National Resources Conservation Service (NRCS) Runoff Curve Number (CN) method" engineering formula applied to the maximum allowable impervious lot coverage for residential property under the Elmhurst Municipal Code and/or the Elmhurst Zoning Ordinance.
(e)
Any Stormwater Storage System that is required under this Section to be installed on residential property located in the City of Elmhurst shall be designed by a Civil Engineer licensed by the State of Illinois and such Stormwater Storage System must be shown on a signed and sealed site plan submitted to the City of Elmhurst at the time a building permit application is made for new single-family home construction.
(f)
Any Stormwater Storage System that is required under this Section to be installed on residential property located in the City of Elmhurst may be in the form of a French-drain, rain garden, underground storage system, rainwater harvesting system and/or any combination thereof or other design as approved by the City Engineer. The location of any Stormwater Storage System that is required under this Section to be installed on residential property located in the City of Elmhurst shall be approved by the City Engineer.
(Ord. No. 04-2018, § 3, 1-16-2018; Ord. No. 11-2019, § 2, 6-17-2019)
(a)
Any owner and/or developer of residential property seeking permits from the City pursuant to the Elmhurst Municipal Code for construction of improvements to an existing home that increases impervious coverage of a residential property shall be required to provide stormwater storage volume on such residential property ("Stormwater Storage System") to offset the increase in stormwater runoff volume that may result from such existing home improvements construction.
(b)
There is no minimum threshold for an additional impervious area caused by the construction of an improvement to an existing home before stormwater management is required under this Section. The stormwater storage volume to be provided for on residential property where an improvement to an existing home is constructed shall be determined using the engineering formula commonly known as the "National Resources Conservation Service (NRCS) Runoff Curve Number (CN) method" applied to the new impervious lot coverage for residential property under the Elmhurst Municipal Code and/or the Elmhurst Zoning Ordinance.
(c)
Each residential property where an improvement to an existing home is constructed resulting in additional impervious area shall provide the required stormwater storage in a manner that promotes stormwater infiltration into the ground while also providing volumetric storage using the "National Resources Conservation Service (NRCS) Runoff Curve Number (CN) method" engineering formula applied to the new impervious lot coverage for residential property under the Elmhurst Municipal Code and/or the Elmhurst Zoning Ordinance.
(d)
Any Stormwater Storage System that is required under this Section to be installed on residential property located in the City of Elmhurst shall be shown on the site plan submitted to the City of Elmhurst at the time a building permit application is made for existing home improvements construction where such construction results in additional imperious area on such residential property.
(e)
Any Stormwater Storage System that is required under this Section to be installed on residential property located in the City of Elmhurst may be in the form of a French-drain, rain garden, underground storage system, rainwater harvesting system, rain barrel and/or any combination thereof or other design as approved by the City Engineer. All roof runoff and sump pump discharge shall be splashed on grade and directed to the stormwater management system via grading, where possible. The location of any Stormwater Storage System that is required under this Section to be installed on residential property located in the City of Elmhurst shall be determined by the property owner and/or the property owner's engineer and shall be approved by the City Engineer.
(f)
Any requests for variance to the stormwater management requirements of this Section due to unique existing site characteristics shall be done by a written letter of request outlining the hardships and/or unique circumstances considered for the site, and shall be submitted along with the permit application, plans and supporting documentation to the City, reviewed administratively by the City Engineer and approved of the City's Director of Public Works. The written letter of request for a variation shall include the property address, contact name and phone number, proposed improvement plans (to scale), NRCS calculation according to the appropriate stormwater management policy, engineering or property owner explanation of unique site characteristics/considerations which require variance, and the amount of stormwater storage that can be provided on site. Variations will be considered on a case by case basis.
(Ord. No. 04-2018, § 3, 1-16-2018; Ord. No. 11-2019, § 2, 6-17-2019)
(a)
Any owner and/or developer of property required under this Chapter to provide stormwater storage volume on such property ("Stormwater Storage System") may seek a variance from the stormwater management requirements and request to pay the City a fee in lieu as a variance to physically providing the stormwater volume storage on site. The property owner and/or developer shall provide the maximum possible amount of stormwater storage on site as required under this Chapter prior to requesting a variance to paying a fee in lieu of for stormwater management.
(b)
Any requests for variance to the stormwater management requirements of this Chapter 14 for the payment to the City of a fee in lieu due to unique existing site characteristics shall be done by a written letter of request outlining the hardships and/or unique circumstances considered for the site, and shall be submitted along with the permit application, plans and supporting documentation to the City. The written letter of request for a variation shall include the property address, contact name and phone number, proposed improvement plans (to scale), NRCS calculation according to the appropriate stormwater management policy, engineering or property owner explanation of unique site characteristics/considerations which require variance, and the amount of stormwater storage that can be provided on site, the amount of stormwater storage that is being requested for fee in lieu along with the corresponding fee. The City may consider a variation request under this Section if the City Engineer determines that meeting the minimum stormwater management requirements are not feasible or physically possible due to the nature or existing physical characteristics of the site. Some examples of possible site conditions which would necessitate a variance under this Section are: mature landscaping on the property or a neighbor's property, ground water levels within two feet of the surface and other unique site circumstances/conditions. Variation requests under this Section shall be reviewed administratively by the City Engineer and approved by the City's Director of Public Works. Variations will be considered on a case by case basis.
(c)
The fee in lieu of payment under this Section shall be as follows:
(1)
For projects that add zero to fifty (50) square feet of net new impervious area, the automatic fee in lieu of payment shall be one hundred twenty-five ($125.00) dollars.
(2)
For projects that add fifty one (51) to one hundred (100) square feet of net new impervious area, the automatic fee in lieu of payment shall be two hundred fifty ($250.00) dollars.
(3)
For projects that add greater than one hundred (100) square feet of net new impervious area, and the variation request is reviewed administratively by the City Engineer and approved by the Director of Public Works, the fee in lieu of payment shall be calculated at a rate of $13.50/cubic foot (cf) of required stormwater storage.
For projects that add one hundred (100) square feet or more of new impervious area, the property owner shall provide the required stormwater storage in a manner that promotes stormwater infiltration into the ground while also providing volumetric storage for the additional runoff. The property owner shall submit a site plan showing the stormwater storage system, in the form of a French-drain, rain garden, underground storage system, rainwater harvesting system, rain barrel, or a combination thereof or such other design approved the by the City Engineer, at the time the property owner applies for a building permit.
The required stormwater storage shall be calculated using the NRCS formula in accordance with the appropriate stormwater management policy under this Chapter. The fee in lieu funds collected by the City will be separately accounted for in a stormwater management account. These funds shall be used to design, construct and maintain water quality or runoff volume reduction improvements as the City deems appropriate. The City Engineer shall provide periodic reports for the stormwater management account established by this Section, and such reports will include property addresses where variances under this Section were granted, the amount paid for fee in lieu, and brief descriptions of variances granted.
(d)
Where the development requires DuPage County "Post Construction Best Management Practices" (PCBMP'S) and where the applicant is allowed to pay a PCBMP fee in lieu payment, the fee in lieu payment shall be the greater of the DuPage County PCBMP fee in lieu program and the City's "Stormwater Fee In Lieu Policy
(Ord. No. 04-2018, § 3, 1-16-2018; Ord. No. 11-2019, § 2, 6-17-2019)
(a)
Before any resident may connect any sump pump, downspout or yard drain to the City's storm sewer, written requests for connection shall be submitted to the City for review and consideration for the City's engineering judgment to determine the final and acceptable drainage improvement plan for each individual request using the general guidelines set-forth in the tables below: "Criteria for Sump Connections to the City Storm Sewer;" "Criteria for Downspout Connections to the City Storm Sewer;" and "Criteria for Yard Drain Connections to the City Storm Sewer."
(b)
Where a resident has made a written request to the City for connection to the City's storm sewer under this Section, the resident may be eligible to participate in cost sharing with the City for construction of the final and acceptable drainage improvement plan approved by the City under this Section subject to the following conditions:
(1)
In situations determined in the sole discretion of the City's Engineer where a public safety issue exists or there is a present immediate flooding concern for the property owner or its neighbor's property, the City will reimburse the resident fifty (50) percent of the cost (up to a maximum of one thousand ($1,000.00) dollars reimbursement) of the construction of the final and acceptable drainage improvement plan approved by the City under this Section;
(2)
In situations determined in the sole discretion of the City's Engineer where a quality of life issue is presented where the problem does not directly damage a structure or create a public safety issue, the City will waive the cost of the City's permit and tap fees for the resident, but, the City will not pay the resident any reimbursement for the cost of construction of the final and acceptable drainage improvement plan approved by the City under this Section;
(3)
Any drainage improvement plans for work to be completed by a private contractor on behalf of a resident shall be approved prior to the commencement of construction in accordance with the requirements of this Section in order to be considered eligible for reimbursement from the City or eligible for waiver of the City's permit and tap fees. Any costs or fees incurred for private property work done outside of this Section are not eligible for reimbursement;
(4)
Any resident participating in this program under this Section must submit a project plan, obtain a building permit, shall schedule e all necessary inspections with the City during the construction of their project, and where reimbursement is being sought, present the City with paid receipts for the project costs.
(5)
In the event that any resident chooses to install stormwater management alternatives in addition to any storm sewer connection, the resident's plan shall be considered under the Section of this Chapter providing for the "Residential Stormwater Management Incentive Program," and any City reimbursement to such resident shall be considered under the provisions Section containing the "Residential Stormwater Management Incentive Program."



(Ord. No. 04-2018, § 3, 1-16-2018; Ord. No. 11-2019, § 2, 6-17-2019)
(a)
The "Residential Stormwater Management Incentive Program" is intended to encourage owners of residential property to further assist the City's stormwater management efforts by way of providing residents monetary incentives to construct stormwater management systems that reduce runoff and promote infiltration, such as, underground storage chamber, underground storage vault, permeable pavers, dry well, rainwater harvesting systems, rain barrels and/or any combination thereof. Participation in this incentive program is available to the following:
(1)
Residents who are proposing redevelopment of their property and/or constructing additional impervious improvements and are willing to provide additional stormwater management above the volume required by this Chapter;
(2)
Residents with existing homes who are not redeveloping their property or constructing additional impervious improvements, but, want to install additional stormwater management to assist the City's stormwater management efforts; and
(3)
Residents with homes that currently have direct connections of sump pumps, downspouts or yard drains to the City's storm sewer that want to disconnect and utilize stormwater management systems.
(b)
The City annually allocates funds for this incentive program to be paid to participating residents on a first-come, first-served basis (until that year's allocation is exhausted) using the "Incentive Payment Table" provided below to determine incentive contribution payments (maximum incentive payment is five thousand ($5,000.00) dollars) by the City. The City's incentive payments under this Section are subject to the following conditions:
(1)
Residents shall submit project plans to the City and obtain approval of the proposed stormwater management system from the City as being a project eligible for incentives under this Section before construction begins;
(2)
Residents shall obtain building permits from the City for the construction of the stormwater management system before construction begins;
(3)
Residents shall schedule all necessary inspections with the City during the construction of their project;
(4)
Residents shall provide the City with paid receipts for the costs of the project;
(5)
Once the above conditions have been satisfied, the City will determine the amount of the incentive payment owing to the resident based upon the formulas provided in the "Incentive Payment Table" below, or in the amount of the actual project cost, whichever cost is lower. Once the incentive amount for a project under this Section is determined, the City shall pay the resident the incentive amount determined.
(c)
As additional incentive to owners of existing homes to disconnect direct connections of sump pumps and downspouts from the City's storm sewer, the City shall waive permit fees for simple disconnection of sump pumps and downspouts and redirection of stormwater to the back yard of the residential property.
(d)
Once a stormwater management system is installed by a resident, it is the obligation of the resident to maintain the stormwater management system at their sole cost and expense.
(e)
The City shall inspect the stormwater management system at the time the residential property is sold.