PRIVATE WATER AND SEWER SYSTEMS
No person shall occupy, lease or permit the occupancy of any building or structure which does not comply with the provisions of this chapter.
(a)
Dwellings. Every building occupied as a dwelling shall have an uncontaminated water supply sufficient for the drinking, bathing, washing and proper sanitation of all occupants; and shall also have a sewage disposal system as provided herein, or as otherwise approved by the DuPage County Health Department as being comparable or better than the system provided herein.
(b)
Places of Employment. Every building where people are employed shall have an uncontaminated water supply sufficient for drinking for all employees and a sewage disposal system as provided herein, or as otherwise approved by the DuPage County Health Department as being comparable or better than the system provided herein.
All sewage disposal systems shall be maintained so as to function properly and prevent sewage from discharging to the ground surface. An action for violation of this section may be brought against the owner, lessee, or a manager of the property wherein the violation occurs.
(a)
No water well, private water supply, or private sewage disposal system shall be constructed or altered unless a permit shall have first been obtained from the DuPage County Health Department or other lawfu1 authority. Permits shall be posted at the location of the water well, water supply, or sewage disposal construction or alteration, or on the building which will be served by said water well, water supply, or sewage disposal system. Permit applications shall contain plans, specifications, lot layout, and such further information or documents as the DuPage County Health Department or other lawful authority may require to insure compliance with the requirements set forth herein. False information shall be deemed a violation of this chapter. There shall be no fee for permits.
(b)
Although a permit application complies with all the requirements provided herein, no permit for a private sewage disposal system shall be issued if the DuPage County Health Department through their experience with similar systems show that the proposed system will not function properly in their opinion after installation.
(a)
Separate Walls. Each single family residence shall have its own separate well on the lot whereon it is located except where such single family residence is connected to and using a public water supply as defined in Chapter 111-1/2, Section 121a, Illinois Revised Statutes.
(b)
Location of Wells. The well sites shall have good surface drainage and if possible be higher than surrounding sources of pollution such as privies, cesspools, septic tanks and sewers.
No well shall be located within 50 feet of the center line of any public road or utility or drainage easement when alternate location is practical.
(c)
Distance of Well from Source of Pollution. A well shall not be located closer than the distance indicated to the following:
1.
No sewer or drain of any kind within 10 feet, regardless of the material with which it is constructed.
2.
No vitrified clay, concrete, asbestos cement, or bituminous sewers or drains with or without sealed joints, no monolithic concrete or steel septic tanks, subsurface grease traps, privy vaults; or open sand filters within 50 feet. Any sewer or drain to be located between 10 feet and 50 feet from the well shall be constructed of cast iron pipe having water-tight joints.
3.
No sub-surface seepage field, stables, barnyards, manure piles, masonry septic tanks, grease traps, catch basins, streams, ponds or lakes, within 75 feet.
4.
No privy pits or seepage pits within 100 feet.
5.
No cesspools within 150 feet.
(d)
Well Drilling. The well driller shall at all times exercise reasonable care in preventing contamination of ground water supplies.
Water used in the drilling operation shall be from a potable source.
Every completed well shall be immediately sealed against entry of contamination, either by installation of the pump and appurtenances as provided herein, or by capping the casing in a water-tight manner.
(e)
Well Casing. Second-hand or reclaimed pipe shall not be used for the well casing. The minimum standard of quality for casing material shall be steel or iron pipe as specified in the following table.
Pipe
Diameter - Inches
Inside diameter of the well casing shall be a minimum of five inches. If a submersible pump is used, minimum inside diameter of the casing shall be not less than one inch greater than the pump diameter.
The well casing shall extend not less than eight inches above the adjacent floor or ground surface. The top of the casing shall be sealed water-tight. A Titless adapter, or pressure tank mounted on top of the well casing shall be considered an integral part of the casing.
Casing joints shall be threaded or welded. All welding shall be done in a good workmanlike manner.
A drive-shoe shall be used on the first length of casing. The contractor shall exercise extreme care in the performance of his work in order to prevent the breakdown or caving in of the strata overlying that from which the water is drawn.
(f)
Pumps. The well pump may be installed in, directly over, or offset, from the well casing in accordance with the type of pump used, but shall not be located in a well pit, crawl space or other inaccessible location. In all cases all openings into the well casing except the vent pipe shall be sealed water-tight. A vent pipe shall be used and its end shall be turned down, screened with non-corrosive #24 mesh screen, and shall terminate at least 12 inches above the top of the ground. If the area at the well site is subject to surface flooding the vent shall extend at least 3 feet above maximum possible high water level. All drop pipe connections to submersible pumps shall be galvanized iron or brass.
If a hand pump is used, a pump platform shall be provided. It shall be of concrete and shall fit tightly around the well casing. It shall be not less than 48 inches square and not less than 4 inches thick. The upper surface of the platform shall be above the finished grade and shall have a crown of not less than one inch above the side edges of the platform to provide surface drainage.
(g)
Pressure Storage. A pressure tank with a minimum storage capacity of 42 gallons per dwelling unit shall be installed. Storage capacities for buildings other than dwellings shall be approved by the DuPage County Health Department on the basis of the use or uses of the property.
The pressure storage tank may be installed directly over the well casing and attached to the casing by means of a watertight joint, or installed in a protected, easily accessible location not subject to flooding. The connection to the well casing shall be watertight.
(h)
Protection Against Freezing. All parts of the water supply system shall be adequately protected from freezing.
(i)
Pitless Adapters. Pitless adapters shall be so constructed that the water supply will be completely protected against contamination. Adapters and method of attachment to the casing shall be watertight by threading or compression coupling.
(j)
Well Pits. Well pits shall not be permitted.
(k)
Chlorination. When a well is to be used as a source of water for human consumption and when the distance to limestone formation in the area is less than 50 feet, adequate and continuous chlorination of all water pumped shall be provided. Chlorination equipment shall be of such type as will provide a minimum of 0.2 PPM chlorine residual at any tap. Information supplied by the State Geological Survey, Urbana, Illinois, shall determine the depth of the limestone formation.
Newly constructed wells must be disinfected with a chlorine solution of at least 100 parts per million, by the person or persons who install the well seal.
No well shall be used until same has been approved by the DuPage County Department of Public Health which approval shall be based upon an analysis of a water sample which shows the water to be safe for drinking. The water sample shall not be obtained until after disinfection and pumping procedures have been completed. Samples shall be properly collected and submitted to the laboratory of the Illinois Department of Public Health or any laboratory approved by that agency for water analysis. Bottles for collection of samples may be obtained from the DuPage County Health Department. Water supplies which are not free from contamination shall be repeatedly chlorinated and tested until the water is proved to be safe for drinking.
(1)
Maintenance, Abandonment. Every water well shall be maintained in a safe condition by the owner.
Every abandoned well shall be filled and sealed watertight.
(a)
Separate Septic System. Each single family residence shall have its own sewage disposal system on the lot whereon it is located except where such single family residence is connected to and using public sewer facilities of a county, municipality or licensed utility.
(b)
Location. The minimum distance between water supply systems and sewage disposal systems, or any parts thereof, shall be as set forth in Section 29.05.
(c)
Downspouts, Sumps, Drains, and Sewers.
1.
Down-spouts and footing drains must not discharge to the sewage disposal system.
2.
Sumps for collection of basement wastes must be constructed of concrete, 4 inches thick, and shall not be permitted less than 50 feet from a well.
3.
Laundry and floor wastes shall be discharged to the sewage disposal system or public sanitary sewer. Downspout and footing drainage shall not discharge into a sump which services laundry, floor or toilet wastes.
4.
Basement drain must discharge to the sewage disposal system.
5.
Minimum size of the house sewer and house drain shall be 6 inches inside diameter. Minimum slope shall be ⅛ inch per foot.
6.
Sewers to the septic tank and from the septic tank to the distribution facility at the seepage field where located under driveways or structures shall be constructed of cast iron. Sewers to the septic tank shall be of cast iron for a minimum distance of 10 feet from the house.
7.
Outflow from grease traps and all other sewage receptacles must discharge into the septic tank or public sanitary sewer.
Septic sewage disposal systems shall conform to the following specifications:
(a)
The tank must be at least 10 feet away from any public or community water supply main or house service. Tank must be more than 5 feet from lot lines and more than 10 feet from the building served.
(b)
Size of the septic tank shall be based on the following:
1.
Minimum capacity below outlet 750 gallons.
2.
If total of bedrooms and baths exceeds four, add 200 gallons for each additional bedroom or bath.
3.
Two tanks in series, or a two compartment tank, may be used provided at least one-half and not more than two-thirds of total capacity is in the first tank compartment.
4.
For buildings other than residences, tank capacity shall be sufficient to provide 24 hour retention plus one cubic foot per capita sludge storage space. Capacity shall be computed on basis of flow rate. (Example: 500 gallons during 8 hour day is equivalent to a flow rate of 1,500 gallons per 24 hours.)
(c)
The tank must be made of either 14 gauge or heavier steel or poured monolithic concrete. Steel tanks must be provided with a properly applied bituminous protective coating on both the exterior and the interior surfaces. Tank construction is as follows:
1.
Minimum depth below outlet, 36 inches.
2.
Maximum depth below outlet, 66 inches.
3.
Inlet baffle or tee 18 inches deep with 12 inches below liquid level.
4.
Outlet baffle or tee 21 inches deep with 15 inches below liquid level.
5.
Outlet and inlet shall be centered at opposite ends of tank with outlet 3 inches lower.
(d)
There shall be a cleanout or inspection pipe extending from the top of the tank to the surface of the ground. The pipe shall have a removable tight seal or plug at the ground surface. All septic tanks shall have reinforced removable lids or inspection ports over inlet and outlet baffles. If the tank lid is buried, inspection pipes to ground surface level shall be installed over the ports. Inspection pipes shall have a minimum diameter of 8 inches.
(a)
Location. Seepage systems shall not be installed in any area where the maximum ground water elevation is less than 4 feet below the ground surface at any time. Seepage systems shall not be installed in any area which tends to be inundated by ponding of storm water or flooding from streams or drainage channels.
(b)
Construction. Sewer and seepage field construction shall be as follows:
1.
Sewer pipe joints shall be firmly mortared at all connections with the septic tank and distribution box.
2.
Header lines and the line from tank to distribution box shall be of cast iron, vitrified tile, concrete pipe, asbestos cement pipe or asphalt impregnated fiber pipe with approved joints.
3.
Sewer and header lines shall be four inch inside diameter or larger.
4.
All seepage lines shall be fed from a central distribution box.
5.
Distribution boxes shall be constructed of concrete of good quality with inlet at least 2 inches above outlets and outlets at least one inch above bottom. The box shall have a removable cover. Baffles shall be provided if necessary to obtain equal flow distribution.
6.
Minimum width of seepage trench, 18 inches.
7.
Maximum width of seepage trench, 36 inches.
8.
Seepage trenches shall be cut with bottom level. All loose material shall be removed from the trench before stone is placed.
9.
Minimum distance between trenches 6 feet or 3 × trench width whichever is greatest (center to center).
10.
Maximum length of each tile line, 100 feet.
11.
Minimum depth of gravel or stone under tile, 6 inches.
12.
Minimum depth of gravel or stone over tile, 2 inches.
13.
Stone or gravel shall be washed and graded so as to be no smaller than ½ inch and no larger than 1 inch.
14.
Minimum slope of seepage lines, 0.1 percent.
15.
Maximum slope of seepage lines, 0.5 percent.
16.
Minimum inside diameter of tile, 4 inches.
17.
Minimum space between seepage tiles, ½ inch.
18.
Maximum space between seepage tiles, 1 inch.
19.
Maximum cover over tile lines (top of tile), 20 inches.
20.
Minimum cover over tile lines (top of tile), 12 inches.
21.
The upper half of all open joints between seepage tiles shall be covered with heavy roofing paper to prevent entrance of soil.
22.
Perforated pipe designed for seepage field use may be used in lieu of field tile.
23.
Blind ends of seepage tile shall be sealed with concrete mortar.
24.
The total bottom area in the seepage trenches shall be determined from the following table using the percolation procedure hereinafter set forth:
Units to be counted:*
(Table of square feet)
* Each bedroom and each bathroom is one unit.
25.
Seepage systems shall be designed and located so that usable reserve space will permit the installation of twice the minimum seepage area required.
26.
Minimum distance from trench sides, or trench ends, or any part of septic system to lot lines or easement lines shall be at least 5 feet.
27.
Seepage system shall be at least 25 feet from any ditch, stream or drain.
28.
Rough and finished grading of seepage field areas shall be so designed and executed with respect to elevation and slope that surface drainage is off the area and away from all nearby wells. All fill used in the seepage field area and to backfill the seepage trenches shall consist of finely divided, porous top soil containing little or no clay.
29.
After a proposed seepage system has been approved, the area in which it is to be installed shall not be disturbed in any way unless alterations are specified in the permit. The proposed seepage field shall be protected against all vehicular traffic to prevent compaction of soil before and after installation.
(c)
Percolation Tests. Percolation test results shall be reported on forms provided by the DuPage County Health Department, and the test procedure shall be as follows:
1.
Number and Location of Tests. Six or more tests shall be made in separate test holes spaced uniformly over the proposed absorption field site. Test holes shall have a minimum depth of 24 inches.
2.
Type of Test Hole. Dig or bore a hole, with horizontal dimensions of from 4 to 12 inches and vertical sides, to the depth of the proposed absorption trench. In order to save time, labor, and volume of water required per test, the holes may be bored with a 4 inch auger.
3.
Preparation of Test Hole. Carefully scratch the bottom and sides of the hole with a knife blade or sharp pointed instrument, in order to remove any smeared soil surfaces and to provide a natural soil interface into which water may percolate. Remove all loose material from the hole.
4.
Saturation and Swelling of the Soil. Carefully fill the hole with clear water to a minimum depth of 12 inches. By refilling if necessary, or by supplying a surplus reservoir of water, such as in an automatic siphon, keep water in the hole overnight or at least 4 hours prior to rate measurement. Allowing the soil to swell overnight is preferable. This saturation procedure insures that the soil is given the opportunity to swell and approach the condition that it will be in during the wettest season of the year. Thus, the test will give comparable results in the same soil whether made in a dry or a wet season.
5.
Percolation Rate Measurement. Percolation rate measurements shall be made on the day following the procedure under Item 4 above.
A.
If no water remains in the hole after the overnight swelling period, add clear water to bring the depth of water in the hole to approximately 6 inches. From a fixed reference point, measure the drop in water level at approximately 30 minute intervals for 4 hours, refilling to a depth of 6 inches as necessary. The drop that occurs during the final - hour period is used to calculate the percolation rate.
B.
In sandy soils (or other soils, in which the first 6 inches of water seeps away in less than 30 minutes, after the overnight swelling period) the time interval between measurement shall be taken as 10 minutes and the test run for 1 hour. The total percolation during 1 hour shall then be reported.
(d)
Plat. Each septic system application shall be accompanied by 4 copies of a plat drawn to scale and fully dimensioned on which the following information is shown:
1.
Location of all wells, septic tanks, sub-surface tile systems, grease traps, privy vaults, sewers, or other sewage disposal facilities on the subject and adjacent lots within 105 feet of the installations proposed. Vacant property and streets shall be indicated.
2.
Locations and dimensions of all proposed buildings and driveways.
3.
Elevations as follows:
A.
Top of foundation.
B.
Sewer invert at foundation.
C.
Sewer invert at tank outlet.
D.
Sewer invert at tank inlet.
E.
Sewer invert at distribution box.
F.
Sewer invert at end of header line.
G.
Sewer invert at end of each lateral.
H.
Sufficient ground elevation to indicate one foot contour intervals.
4.
All elevations shall be related to a convenient bench mark which shall be specified.
5.
Locations of seepage test holes shall be shown and correlated with test hole numbers on the seepage test charts.
6.
Highwater elevation of nearest ditch, creek, swamp or open waterways, except roadside ditches, shall be specified on septic system plans along with distance from same to subject lot.
7.
Location of future buildings, especially garages, shall be indicated.
8.
Plans for buildings other than residences shall include location of parking areas required by the DuPage County zoning regulations.
9.
All trees within ten (10) feet of any septic field line shall be removed.
(e)
Fill Material. If fill material is to be placed over any part of the seepage field area or within ten (10) feet thereof to a depth of more than eighteen (18) inches it shall be done as follows:
1.
Porous material only shall be placed over the seepage field area and for a distance of ten (10) feet beyond the end of the laterals.
2.
For a distance of ten (10) feet beyond the porous fill impervious material shall be placed and compacted in such a manner as to prevent leaking at the top of the slope.
3.
If the seepage system is to be installed within one year of completion of the filling operation, then the fill shall be placed in layers and compacted in such a manner that the tile lines shall not settle at the top of the slope.
(f)
Limestone Formations. Seepage systems for disposal of septic tank effluent shall not be used where the depth from the ground surface to the limestone formation is less than thirty (30) feet. Information supplied by the State Geological Survey, Urbana, Illinois, shall determine depth to limestone formation. If this condition prevails, the DuPage County Health Department may prescribe an alternate system.
(a)
The owner or contractor shall give twenty-four (24) hours' advance notice to the DuPage County Health Department or the City of Elmhurst before any backfilling and after the septic tank and seepage system has been installed; and before final inspection of any well, private water supply, and sewage disposal system, on permits obtained from the DuPage County Health Department.
(b)
No person shall refuse to allow a representative of the DuPage County Health Department or the City of Elmhurst to inspect any well, private water supply, or sewage disposal system after written notice from the DuPage County Health Department that it has reason to believe a violation exists, and that it requests permission to make an inspection during reasonable hours.
(c)
No person except a representative of DuPage County Health Department or the City of Elmhurst shall remove or allow to be removed a notice of violation posted on any property for a violation of this Chapter.
(a)
Charges for the treatment of wastewater generated by premises served by a privately owned well shall be as follows:
(b)
In the event of nonpayment of the charges under this Section, the provisions of Section 7.209 of the Elmhurst Municipal Code shall apply as if fully set forth herein.
(4/1/96; 6/15/98; Ord. 9-2000 § 1; Ord. 06-2002 § 1; Ord. 27-2003 § 1; Ord. 16-2004 § 1; Ord. 13-2008 § 1)
(Ord. 13-2009, § 1, 7-20-2009; Ord. No. 16-2010, § 1, 5-17-2010; Ord. No. 08-2011, § 1, 7-5-2011; Ord. No. 17-2012, § 2, 7-16-2012; Ord. No. 07-2013, § 1, 7-1-2013; Ord. No. 06-2014-A, § 1, 5-5-2014; Ord. No. 04-2015, § 1, 2-17-2015; Ord. No. 03-2016, § 1, 3-7-2016; Ord. No. 08-2017, § 1, 2-6-2017; Ord. No. 05-2018, § 1, 2-5-2018; Ord. No. 04-2019, § 1, 3-18-2019; Ord. No. 06-2021, § 1, 5-3-2021; Ord. No. MCO-01-2023, § 1, 2-6-2023; Ord. No. MCO-02-2024, § 7, 2-20-2024)
Charges for the installation of meters on private wells shall be the same as in the case of premises served by the public water system.
(6/23/88)
The DuPage County Health Department may revoke and suspend permits when they are issued in error, or where the provisions of this Chapter are violated. The reason for the revocation or suspension of a permit shall be posted in writing at the site of the violation, or mailed to the applicant at the address provided in the permit application.
(a.m. 6/23/88)
Any person who violates any provision of this Chapter shall be guilty of a misdemeanor and fined not less than fifty dollars ($50.00) nor more than five hundred dollars ($500.00) for each offense. Each day upon which such violation continues shall constitute a separate offense.
(a.m. 6/23/88)