The developer shall post with the Borough, upon the inspection and issuance of final approval of the following private site improvements by the Borough Engineer, a maintenance guarantee in an amount not to exceed 15% of the cost of the installation, which cost shall be determined by the Borough Engineer according to the method of calculation set forth in section 15 of N.J.S.A. 40:55D-53.4, of the following private site improvements:
1. Stormwater management basins,
2. In-flow and water quality structures within the basins, and
3. The out-flow pipes and structures of the stormwater management system, if any.