Zoneomics Logo
search icon

Montgomery City Zoning Code

§ 16-4.7

MR/SI Mountain Residential/Special Industrial.

[Ord. #85-482, S 407; Ord. #97-714, S 2; Ord. #08-1294, S 2; amended 4-18-2024 by Ord. No. 24-1723]
a. 
Principal Permitted Use on the Land and in Buildings.
1. 
All uses specified for the MR District in Subsection 16-4.6 of this chapter in accordance with the provisions and requirements specified herein.
2. 
Processing of the products of a stone or rock excavating or quarrying operation when such processing is physically and operationally integrated with the extracting or quarrying use. Processing shall include grinding, polishing, coloring and otherwise treating the raw materials extracted or excavated, but shall not include the further use of such products in the manufacture of derivative or secondary products which are substantially different in form or character from the original raw products. No excavation or quarrying shall be permitted.
3. 
Cellular antennas for telephone, radio, paging and/or television communication as conditional uses under N.J.S.A. 40:55D-67 (see Subsection 16-6.1, Conditional Uses, and specifically Subsection 16-6.1p for the required conditions for cellular antennas for telephone, radio, paging and/or television communication).
Accessory Building Minimum
Distance to side line (1)
100'
Distance to rear line (1)
100'
Distance to other building
50'
Maximums
Building coverage of principal building
25%
Building coverage of accessory building(s)
10%
(1)
No provision stipulated herein shall prohibit a permitted use from being situated adjacent to a railroad right-of-way for purposes of loading and unloading materials or adjacent to a municipal boundary line where an integrated operation crossing said line is involved.
e.
General Requirements for Processing Activities.
1.
Any lot may contain more than one principal building, provided that the minimum lot size is at least 100 acres and that all land coverage requirements of this chapter are met.
2.
At least 100 feet adjacent to any street line or lot line shall not be used for parking and shall be planted and maintained in lawn area or ground cover, and landscaped with evergreen shrubbery.
3.
Dust and smoke from processing operations will be minimized by the installation and use of appropriate mechanical and electrical devices. Internal roads, drives and parking areas will be hardsurfaced where practicable, or maintained in a dust-free condition at all times. All dry wastes in the form of dust or fine particles will be transported in covered or closed vehicles, and disposal shall be in a manner and in a place approved by the Township.
4.
A minimum buffer area of 200 feet shall be provided along all property lines. Where natural growth does not provide adequate buffer, such buffer areas shall be in accordance with subsection 14-3.12d2 of Chapter 14, except that railroad spurs, utility lines and access roads perpendicular to existing public streets may traverse the buffer area, and except further that parking spaces for passenger automobiles may be placed within the buffer area, provided that such parking spaces are not less than 100 feet from any street or lot line.
f.
Minimum Off-Street Parking for Processing Activities. The provisions specified in subsection 16-4.6f shall apply.
g.
Minimum Off-Street Loading for Processing Activities. The provisions specified in subsection 16-4.5g shall apply.
h.
Signs for Processing Activities. The provisions specified in subsection 16-4.6h shall apply.