Stormwater Management and Grading.
The applicant shall bear the burden to demonstrate that all prior development, singularly or in the aggregate, since February 2, 2004, or March 2, 2021, (as applicable) do not result in the project being considered a Major Development if the applicant believes an application should be considered a Minor Development. |
The general intention is to include projects undertaken on contiguous or formerly contiguous lands that are within the same and adjoining watershed areas, when applicable. The definition of Major Development listed herein is not intended to include cumulative activities for distinctly different projects undertaken at various and separate locations throughout Montgomery Township. |
Table 1 Green Infrastructure BMPs for Groundwater Recharge, Stormwater Runoff Quality, and/or Stormwater Runoff Quantity | ||||
|---|---|---|---|---|
Best Management Practice | Stormwater Runoff Quality TSS Removal Rate (percent) | Stormwater Runoff Quantity | Groundwater Recharge | Minimum Separation from Seasonal High Water Table (feet) |
Cistern | 0 | Yes | No | — |
Dry well(a) | 0 | No | Yes | 2 |
Grass swale | 50 or less | No | No | 2(e) 1(f) |
Green roof | 0 | Yes | No | — |
Manufactured treatment device(a)(g) | 50 or 80 | No | No | Dependent upon the device |
Pervious paving system(a) | 80 | Yes | Yes(b) No(c) | 2(b) 1(c) |
Small-scale bioretention basin(a) | 80 or 90 | Yes | Yes(b) No(c) | 2(b) 1(c) |
Small-scale infiltration basin(a) | 80 | Yes | Yes | 2 |
Small-scale sand filter | 80 | Yes | Yes | 2 |
Vegetative filter strip | 60 to 80 | No | No | — |
(Notes corresponding to annotations are found after Table 3.) |
Table 2 Green Infrastructure BMPs for Stormwater Runoff Quantity (or for Groundwater Recharge and/or Stormwater Runoff Quality with a Waiver or Variance from N.J.A.C. 7:8-5.3) | ||||
|---|---|---|---|---|
Best Management Practice | Stormwater Runoff Quality TSS Removal Rate (percent) | Stormwater Runoff Quantity | Groundwater Recharge | Minimum Separation from Seasonal High Water Table (feet) |
Bioretention system | 80 or 90 | Yes | Yes(b) No(c) | 2(b) 1(c) |
Infiltration basin | 80 | Yes | Yes | 2 |
Sand filter(b) | 80 | Yes | Yes | 2 |
Standard constructed wetland | 90 | Yes | No | N/A |
Wet pond(d) | 50 to 90 | Yes | No | N/A |
(Notes corresponding to annotations are found after Table 3.) |
Table 3 BMPs for Groundwater Recharge, Stormwater Runoff Quality, and/or Stormwater Runoff Quantity only with a Waiver or Variance from N.J.A.C. 7:8-5.3 | ||||
|---|---|---|---|---|
Best Management Practice | Stormwater Runoff Quality TSS Removal Rate (percent) | Stormwater Runoff Quantity | Groundwater Recharge | Minimum Separation from Seasonal High Water Table (feet) |
Blue roof | 0 | Yes | No | N/A |
Extended detention basin | 40 to 60 | Yes | No | 1 |
Manufactured treatment device(h) | 50 or 80 | No | No | Dependent upon the device |
Sand filter(c) | 80 | Yes | No | 1 |
Subsurface gravel wetland | 90 | No | No | 1 |
Wet pond | 50 to 90 | Yes | No | N/A |
Notes to Tables 1, 2, and 3: | |
(a) | Subject to the applicable contributory drainage area limitation specified in Table 4. |
(b) | Designed to infiltrate into the subsoil. |
(c) | Designed with underdrains. |
(d) | Designed to maintain at least a ten-foot wide area of native vegetation along at least 50% of the shoreline and to include a stormwater runoff retention component designed to capture stormwater runoff for beneficial reuse, such as irrigation. |
(e) | Designed with a slope of less than 2%. |
(f) | Designed with a slope of equal to or greater than 2%. |
(g) | Manufactured treatment devices that meet the definition of "Green Infrastructure." |
(h) | Manufactured treatment devices that do not meet the definition of "Green Infrastructure." |
Table 4 Green Infrastructure BMP Maximum Contributory Drainage Areas | |
|---|---|
Best Management Practice | Maximum Contributory Drainage Area |
Dry well | 1 acre |
Manufactured treatment device | 2.5 acres |
Pervious pavement systems | Area of additional inflow cannot exceed 3 times the area occupied by the BMP |
Small-scale bioretention systems | 2.5 acres |
Small-scale infiltration basin | 2.5 acres |
Small-scale sand filter | 2.5 acres |
Table 5 NJDEP 1.25 inch/2 hour Stormwater Quality Design Storm Cumulative and Incremental Rainfall Distributions [source: BMP Manual] | |||||
|---|---|---|---|---|---|
Time (minutes) | Cumulative Rainfall (inches) | Time (minutes) | Cumulative Rainfall (inches) | Time (minutes) | Cumulative Rainfall (inches) |
1 | 0.00166 | 41 | 0.1728 | 81 | 1.0906 |
2 | 0.00332 | 42 | 0.1796 | 82 | 1.0972 |
3 | 0.00498 | 43 | 0.1864 | 83 | 1.1038 |
4 | 0.00664 | 44 | 0.1932 | 84 | 1.1104 |
5 | 0.00830 | 45 | 0.2000 | 85 | 1.1170 |
6 | 0.00996 | 46 | 0.2117 | 86 | 1.1236 |
7 | 0.01162 | 47 | 0.2233 | 87 | 1.1302 |
8 | 0.01328 | 48 | 0.2350 | 88 | 1.1368 |
9 | 0.01494 | 49 | 0.2466 | 89 | 1.1434 |
10 | 0.01660 | 50 | 0.2583 | 90 | 1.1500 |
11 | 0.01828 | 51 | 0.2783 | 91 | 1.1550 |
12 | 0.01996 | 52 | 0.2983 | 92 | 1.1600 |
13 | 0.02164 | 53 | 0.3183 | 93 | 1.1650 |
14 | 0.02332 | 54 | 0.3383 | 94 | 1.1700 |
15 | 0.02500 | 55 | 0.3583 | 95 | 1.1750 |
16 | 0.03000 | 56 | 0.4116 | 96 | 1.1800 |
17 | 0.03500 | 57 | 0.4650 | 97 | 1.1850 |
18 | 0.04000 | 58 | 0.5183 | 98 | 1.1900 |
19 | 0.04500 | 59 | 0.5717 | 99 | 1.1950 |
20 | 0.05000 | 60 | 0.6250 | 100 | 1.2000 |
21 | 0.05500 | 61 | 0.6783 | 101 | 1.2050 |
22 | 0.06000 | 62 | 0.7317 | 102 | 1.2100 |
23 | 0.06500 | 63 | 0.7850 | 103 | 1.2150 |
24 | 0.07000 | 64 | 0.8384 | 104 | 1.2200 |
25 | 0.07500 | 65 | 0.8917 | 105 | 1.2250 |
26 | 0.08000 | 66 | 0.9117 | 106 | 1.2267 |
27 | 0.08500 | 67 | 0.9317 | 107 | 1.2284 |
28 | 0.09000 | 68 | 0.9517 | 108 | 1.2300 |
29 | 0.09500 | 69 | 0.9717 | 109 | 1.2317 |
30 | 0.10000 | 70 | 0.9917 | 110 | 1.2334 |
31 | 0.10660 | 71 | 1.0034 | 111 | 1.2351 |
32 | 0.11320 | 72 | 1.0150 | 112 | 1.2367 |
33 | 0.11980 | 73 | 1.0267 | 113 | 1.2384 |
34 | 0.12640 | 74 | 1.0383 | 114 | 1.2400 |
35 | 0.13300 | 75 | 1.0500 | 115 | 1.2417 |
36 | 0.13960 | 76 | 1.0568 | 116 | 1.2434 |
37 | 0.14620 | 77 | 1.0636 | 117 | 1.2450 |
38 | 0.15280 | 78 | 1.0704 | 118 | 1.2467 |
39 | 0.15940 | 79 | 1.0772 | 119 | 1.2483 |
40 | 0.16600 | 80 | 1.0840 | 120 | 1.2500 |
Table 6 Pollutant Removal Rates for BMPs[1] | |||
|---|---|---|---|
Best Management Practice | Stormwater Runoff Quality TSS Removal Rate (percent) | Total Phosphorus Removal Rate (percent) | Total Nitrogen Removal Rate (percent) |
Bioretention systems | 90 | 60 | 30 |
Constructed stormwater wetland | 90 | 50 | 30 |
Extended detention basin | 40 to 60 (detention time & volume dependent) | 20 | 20 |
Infiltration basin | 80 | 60 | 50 |
Manufactured treatment device | As certified by NJDEP | ||
Porous paving or permeable pavers with storage bed | 80 | 60 | 50 |
Sand filter | 80 | 50 | 35 |
Vegetative filter strip* | 60 (turf grass) 70 (native grasses, meadow, & planted woods) 80 (indigenous woods) | 30 | 30 |
Wet pond/retention basin | 50 to 90 (detention time & volume dependent) | 50 | 30 |
* | For filter strips with multiple vegetated covers, the final TSS removal rate should be based upon a weighted average of the adopted rates shown in this table, based upon the relative flow lengths through each cover type. |
[1] | Source: N.J.A.C. 7:8 and BMP Manual Chapter 4. |
Table 7 Minimum Required Separation Distances for Infiltration BMPs from Various Components | |
|---|---|
Component | Minimum Horizontal Distance between Component and BMP |
Property line | 10 feet |
Building w/slab | |
Pool | 20 feet |
Building w/basement | 25 feet |
Surface basin | |
Well or suction line | 50 feet |
Septic disposal field, including reserve field | |
Seepage pit | |
Cesspool | |
R = A + B - (A x B)/100, |
Where: | ||
R | = | total TSS Percent Load Removal from application of both BMPs, and |
A | = | the TSS Percent Removal Rate applicable to the first BMP |
B | = | the TSS Percent Removal Rate applicable to the second BMP. |
Stormwater Management and Grading.
The applicant shall bear the burden to demonstrate that all prior development, singularly or in the aggregate, since February 2, 2004, or March 2, 2021, (as applicable) do not result in the project being considered a Major Development if the applicant believes an application should be considered a Minor Development. |
The general intention is to include projects undertaken on contiguous or formerly contiguous lands that are within the same and adjoining watershed areas, when applicable. The definition of Major Development listed herein is not intended to include cumulative activities for distinctly different projects undertaken at various and separate locations throughout Montgomery Township. |
Table 1 Green Infrastructure BMPs for Groundwater Recharge, Stormwater Runoff Quality, and/or Stormwater Runoff Quantity | ||||
|---|---|---|---|---|
Best Management Practice | Stormwater Runoff Quality TSS Removal Rate (percent) | Stormwater Runoff Quantity | Groundwater Recharge | Minimum Separation from Seasonal High Water Table (feet) |
Cistern | 0 | Yes | No | — |
Dry well(a) | 0 | No | Yes | 2 |
Grass swale | 50 or less | No | No | 2(e) 1(f) |
Green roof | 0 | Yes | No | — |
Manufactured treatment device(a)(g) | 50 or 80 | No | No | Dependent upon the device |
Pervious paving system(a) | 80 | Yes | Yes(b) No(c) | 2(b) 1(c) |
Small-scale bioretention basin(a) | 80 or 90 | Yes | Yes(b) No(c) | 2(b) 1(c) |
Small-scale infiltration basin(a) | 80 | Yes | Yes | 2 |
Small-scale sand filter | 80 | Yes | Yes | 2 |
Vegetative filter strip | 60 to 80 | No | No | — |
(Notes corresponding to annotations are found after Table 3.) |
Table 2 Green Infrastructure BMPs for Stormwater Runoff Quantity (or for Groundwater Recharge and/or Stormwater Runoff Quality with a Waiver or Variance from N.J.A.C. 7:8-5.3) | ||||
|---|---|---|---|---|
Best Management Practice | Stormwater Runoff Quality TSS Removal Rate (percent) | Stormwater Runoff Quantity | Groundwater Recharge | Minimum Separation from Seasonal High Water Table (feet) |
Bioretention system | 80 or 90 | Yes | Yes(b) No(c) | 2(b) 1(c) |
Infiltration basin | 80 | Yes | Yes | 2 |
Sand filter(b) | 80 | Yes | Yes | 2 |
Standard constructed wetland | 90 | Yes | No | N/A |
Wet pond(d) | 50 to 90 | Yes | No | N/A |
(Notes corresponding to annotations are found after Table 3.) |
Table 3 BMPs for Groundwater Recharge, Stormwater Runoff Quality, and/or Stormwater Runoff Quantity only with a Waiver or Variance from N.J.A.C. 7:8-5.3 | ||||
|---|---|---|---|---|
Best Management Practice | Stormwater Runoff Quality TSS Removal Rate (percent) | Stormwater Runoff Quantity | Groundwater Recharge | Minimum Separation from Seasonal High Water Table (feet) |
Blue roof | 0 | Yes | No | N/A |
Extended detention basin | 40 to 60 | Yes | No | 1 |
Manufactured treatment device(h) | 50 or 80 | No | No | Dependent upon the device |
Sand filter(c) | 80 | Yes | No | 1 |
Subsurface gravel wetland | 90 | No | No | 1 |
Wet pond | 50 to 90 | Yes | No | N/A |
Notes to Tables 1, 2, and 3: | |
(a) | Subject to the applicable contributory drainage area limitation specified in Table 4. |
(b) | Designed to infiltrate into the subsoil. |
(c) | Designed with underdrains. |
(d) | Designed to maintain at least a ten-foot wide area of native vegetation along at least 50% of the shoreline and to include a stormwater runoff retention component designed to capture stormwater runoff for beneficial reuse, such as irrigation. |
(e) | Designed with a slope of less than 2%. |
(f) | Designed with a slope of equal to or greater than 2%. |
(g) | Manufactured treatment devices that meet the definition of "Green Infrastructure." |
(h) | Manufactured treatment devices that do not meet the definition of "Green Infrastructure." |
Table 4 Green Infrastructure BMP Maximum Contributory Drainage Areas | |
|---|---|
Best Management Practice | Maximum Contributory Drainage Area |
Dry well | 1 acre |
Manufactured treatment device | 2.5 acres |
Pervious pavement systems | Area of additional inflow cannot exceed 3 times the area occupied by the BMP |
Small-scale bioretention systems | 2.5 acres |
Small-scale infiltration basin | 2.5 acres |
Small-scale sand filter | 2.5 acres |
Table 5 NJDEP 1.25 inch/2 hour Stormwater Quality Design Storm Cumulative and Incremental Rainfall Distributions [source: BMP Manual] | |||||
|---|---|---|---|---|---|
Time (minutes) | Cumulative Rainfall (inches) | Time (minutes) | Cumulative Rainfall (inches) | Time (minutes) | Cumulative Rainfall (inches) |
1 | 0.00166 | 41 | 0.1728 | 81 | 1.0906 |
2 | 0.00332 | 42 | 0.1796 | 82 | 1.0972 |
3 | 0.00498 | 43 | 0.1864 | 83 | 1.1038 |
4 | 0.00664 | 44 | 0.1932 | 84 | 1.1104 |
5 | 0.00830 | 45 | 0.2000 | 85 | 1.1170 |
6 | 0.00996 | 46 | 0.2117 | 86 | 1.1236 |
7 | 0.01162 | 47 | 0.2233 | 87 | 1.1302 |
8 | 0.01328 | 48 | 0.2350 | 88 | 1.1368 |
9 | 0.01494 | 49 | 0.2466 | 89 | 1.1434 |
10 | 0.01660 | 50 | 0.2583 | 90 | 1.1500 |
11 | 0.01828 | 51 | 0.2783 | 91 | 1.1550 |
12 | 0.01996 | 52 | 0.2983 | 92 | 1.1600 |
13 | 0.02164 | 53 | 0.3183 | 93 | 1.1650 |
14 | 0.02332 | 54 | 0.3383 | 94 | 1.1700 |
15 | 0.02500 | 55 | 0.3583 | 95 | 1.1750 |
16 | 0.03000 | 56 | 0.4116 | 96 | 1.1800 |
17 | 0.03500 | 57 | 0.4650 | 97 | 1.1850 |
18 | 0.04000 | 58 | 0.5183 | 98 | 1.1900 |
19 | 0.04500 | 59 | 0.5717 | 99 | 1.1950 |
20 | 0.05000 | 60 | 0.6250 | 100 | 1.2000 |
21 | 0.05500 | 61 | 0.6783 | 101 | 1.2050 |
22 | 0.06000 | 62 | 0.7317 | 102 | 1.2100 |
23 | 0.06500 | 63 | 0.7850 | 103 | 1.2150 |
24 | 0.07000 | 64 | 0.8384 | 104 | 1.2200 |
25 | 0.07500 | 65 | 0.8917 | 105 | 1.2250 |
26 | 0.08000 | 66 | 0.9117 | 106 | 1.2267 |
27 | 0.08500 | 67 | 0.9317 | 107 | 1.2284 |
28 | 0.09000 | 68 | 0.9517 | 108 | 1.2300 |
29 | 0.09500 | 69 | 0.9717 | 109 | 1.2317 |
30 | 0.10000 | 70 | 0.9917 | 110 | 1.2334 |
31 | 0.10660 | 71 | 1.0034 | 111 | 1.2351 |
32 | 0.11320 | 72 | 1.0150 | 112 | 1.2367 |
33 | 0.11980 | 73 | 1.0267 | 113 | 1.2384 |
34 | 0.12640 | 74 | 1.0383 | 114 | 1.2400 |
35 | 0.13300 | 75 | 1.0500 | 115 | 1.2417 |
36 | 0.13960 | 76 | 1.0568 | 116 | 1.2434 |
37 | 0.14620 | 77 | 1.0636 | 117 | 1.2450 |
38 | 0.15280 | 78 | 1.0704 | 118 | 1.2467 |
39 | 0.15940 | 79 | 1.0772 | 119 | 1.2483 |
40 | 0.16600 | 80 | 1.0840 | 120 | 1.2500 |
Table 6 Pollutant Removal Rates for BMPs[1] | |||
|---|---|---|---|
Best Management Practice | Stormwater Runoff Quality TSS Removal Rate (percent) | Total Phosphorus Removal Rate (percent) | Total Nitrogen Removal Rate (percent) |
Bioretention systems | 90 | 60 | 30 |
Constructed stormwater wetland | 90 | 50 | 30 |
Extended detention basin | 40 to 60 (detention time & volume dependent) | 20 | 20 |
Infiltration basin | 80 | 60 | 50 |
Manufactured treatment device | As certified by NJDEP | ||
Porous paving or permeable pavers with storage bed | 80 | 60 | 50 |
Sand filter | 80 | 50 | 35 |
Vegetative filter strip* | 60 (turf grass) 70 (native grasses, meadow, & planted woods) 80 (indigenous woods) | 30 | 30 |
Wet pond/retention basin | 50 to 90 (detention time & volume dependent) | 50 | 30 |
* | For filter strips with multiple vegetated covers, the final TSS removal rate should be based upon a weighted average of the adopted rates shown in this table, based upon the relative flow lengths through each cover type. |
[1] | Source: N.J.A.C. 7:8 and BMP Manual Chapter 4. |
Table 7 Minimum Required Separation Distances for Infiltration BMPs from Various Components | |
|---|---|
Component | Minimum Horizontal Distance between Component and BMP |
Property line | 10 feet |
Building w/slab | |
Pool | 20 feet |
Building w/basement | 25 feet |
Surface basin | |
Well or suction line | 50 feet |
Septic disposal field, including reserve field | |
Seepage pit | |
Cesspool | |
R = A + B - (A x B)/100, |
Where: | ||
R | = | total TSS Percent Load Removal from application of both BMPs, and |
A | = | the TSS Percent Removal Rate applicable to the first BMP |
B | = | the TSS Percent Removal Rate applicable to the second BMP. |