All measurements necessary in order to determine the distance from a building to a lot line shall be made from the eaves or furthest extension of a building to the lot line.
Ogden City Zoning Code
155.11 MEASUREMENTS
All measurements necessary in order to determine the distance from a building to a lot line shall be made from the eaves or furthest extension of a building to the lot line.