Vegetation sufficient to stabilize the soils shall be established on all disturbed areas as each stage of grading is completed. All disturbed soil surfaces shall be stabilized or covered prior to the first day of November. If the planned impervious surface (e.g., roads, driveways, etc.) cannot be established prior to November, a temporary treatment adequate to prevent erosion shall be installed on those surfaces.