Zoneomics Logo
search icon

Batesburg Leesville
City Zoning Code

11-3

APPLICATION FOR ZONING PERMIT.

11-3.1.

In applying to the Zoning Administrator for a zoning permit, the applicant shall submit a dimensioned sketch or scale plan indicating the shape, size and location of the lot to be built upon and the shape, size, height, use and location of the building already on the lot, the number of dwelling units the building is designed to accommodate, if any, the setback lines of buildings on adjoining lots, off-street parking space, and other information concerning the lot or adjoining lots as may be essential for determining whether the provisions of this Ordinance are being observed.

11-3.2.

If the proposed excavation, filling or construction, as set forth in the application are in conformity with the provisions of this Ordinance and other Town, County, State or Federal regulations, then in force, the Zoning Administrator shall issue a zoning permit upon payment of any required fees. If a zoning permit is refused, the Zoning Administrator shall state such refusal in writing with the cause.

11-3.3.

Before commencing either excavation or construction, the zoning permit (or copy) shall be placed conspicuously on the front property line therein described for the duration of the excavation or construction and in such a way that it is protected from the weather.

11-3.4.

All DHEC regulations regarding asbestos removal must be met prior to any demolition or renovations.

(Ord. of 11-14-2005)