Plans.
System plans shall be submitted for approval to the Administrator or to the State in accordance with Wis. Admin. Code ch. SPS 383. Plans shall comply with the requirements of Wis. Admin. Code ch. SPS 383, and this ordinance.
(1)
Plans submitted to the Administrator shall include the original and as many copies as are required by the County.
(2)
If plans are reviewed and approved by the State, at least one set of the plans submitted to the Administrator shall bear a State approval stamp or seal.
(3)
Plans submitted shall be clear, legible and permanent copies.
(4)
Plans submitted shall comply with Wis. Admin. Code ch. SPS 383, and include the following:
(a)
The name of the property owner and the legal description of the site.
(b)
Estimated daily wastewater flow and design wastewater flow.
(c)
A detailed plot plan (site plan), dimensioned or drawn to scale, on paper no smaller than eight and one-half inches by 11 inches in size, or larger than 11 inches by 17 inches. The plot plan shall delineate the lot size and the location of all existing and proposed: POWTS components; building sewers; private interceptor main sewers; wells; water mains or water services; buildings; lot lines; swimming pools; navigable waters; and the benchmark established on the Soil and Site Evaluation Report. Adjoining properties shall be checked to ensure that the horizontal setback parameters in Wis. Admin. Code § SPS 383.43, are complied with. All separating distances and dimensions shall be clearly shown on the plot plan.
(d)
Details and configuration layouts depicting how the system is to be constructed.
(e)
A management plan for the proposed system.
(f)
A description of a contingency plan in the event the proposed POWTS fails and cannot be repaired.
(g)
Sufficient supporting information to determine whether the proposed design, installation and management of the proposed POWTS or modification to an existing system complies with this ordinance.
(5)
Plans shall be signed or sealed as specified in Wis. Admin. Code ch. SPS 383.
(6)
A copy of the approved plans shall be maintained at the construction site until the POWTS installation is completed, inspected and accepted. The plans shall be made available to the Administrator or the State upon request.
(7)
A modification to the design of a POWTS which has been previously approved shall be submitted to the Administrator or the State as specified in Wis. Admin. Code ch. SPS 383. Plan revisions must be approved prior to system installation. A fee may be charged when submitting revised plans.
Plans.
System plans shall be submitted for approval to the Administrator or to the State in accordance with Wis. Admin. Code ch. SPS 383. Plans shall comply with the requirements of Wis. Admin. Code ch. SPS 383, and this ordinance.
(1)
Plans submitted to the Administrator shall include the original and as many copies as are required by the County.
(2)
If plans are reviewed and approved by the State, at least one set of the plans submitted to the Administrator shall bear a State approval stamp or seal.
(3)
Plans submitted shall be clear, legible and permanent copies.
(4)
Plans submitted shall comply with Wis. Admin. Code ch. SPS 383, and include the following:
(a)
The name of the property owner and the legal description of the site.
(b)
Estimated daily wastewater flow and design wastewater flow.
(c)
A detailed plot plan (site plan), dimensioned or drawn to scale, on paper no smaller than eight and one-half inches by 11 inches in size, or larger than 11 inches by 17 inches. The plot plan shall delineate the lot size and the location of all existing and proposed: POWTS components; building sewers; private interceptor main sewers; wells; water mains or water services; buildings; lot lines; swimming pools; navigable waters; and the benchmark established on the Soil and Site Evaluation Report. Adjoining properties shall be checked to ensure that the horizontal setback parameters in Wis. Admin. Code § SPS 383.43, are complied with. All separating distances and dimensions shall be clearly shown on the plot plan.
(d)
Details and configuration layouts depicting how the system is to be constructed.
(e)
A management plan for the proposed system.
(f)
A description of a contingency plan in the event the proposed POWTS fails and cannot be repaired.
(g)
Sufficient supporting information to determine whether the proposed design, installation and management of the proposed POWTS or modification to an existing system complies with this ordinance.
(5)
Plans shall be signed or sealed as specified in Wis. Admin. Code ch. SPS 383.
(6)
A copy of the approved plans shall be maintained at the construction site until the POWTS installation is completed, inspected and accepted. The plans shall be made available to the Administrator or the State upon request.
(7)
A modification to the design of a POWTS which has been previously approved shall be submitted to the Administrator or the State as specified in Wis. Admin. Code ch. SPS 383. Plan revisions must be approved prior to system installation. A fee may be charged when submitting revised plans.