Existing POWTS Evaluation Reports.
(1)
When an evaluation of an existing POWTS is required by this ordinance, an existing POWTS Evaluation Report shall be completed which shall include all of the following:
(a)
A Soil and Site Evaluation Report verifying that the vertical separation distance between the infiltrative surface of the existing treatment or dispersal component and estimated high groundwater and/or bedrock complies with Wis. Admin. Code ch. SPS 383. Submittal of a soil and site evaluation report may not be required if:
1.
The existing POWTS is a code compliant holding tank; or
2.
A Soil and Site Evaluation Report, which is not a percolation test, is on file which was submitted to and approved by the Administrator maybe required based on site conditions. The County may accept older Soil and Site Evaluation Reports on a case by case basis.
(b)
A report provided by a plumber, certified septage servicing operator, certified POWTS inspector or other person(s) authorized to do so by Wis. Admin. Code ch. SPS 383, relative to the condition, capacities, and code compliance of any existing treatment or holding tanks.
(c)
A report provided by a plumber, certified POWTS inspector, or other person(s) authorized to do so by Wis. Admin. Code ch. SPS 383, relative to the condition, capacities, and code compliance of all other system components.
(d)
A plot plan prepared by a plumber, certified soil tester, certified POWTS inspector, or other person(s) authorized to do so by Wis. Admin. Code ch. SPS 383, including information specified in section 7.9.15(4)(c) of this ordinance, unless an accurate plot plan is on file with the Planning and Zoning Department.
(e)
An evaluation of the use and wastewater flow of the structure(s) served relative to the capacity of the existing POWTS.
(f)
Verification that all domestic wastewater from the structure discharges into the POWTS.
(2)
Existing POWTS Evaluation Reports must be on forms provided by or in a format approved by the Planning and Zoning Department. Existing POWTS Evaluation Reports must be signed by the licensed or certified person(s) performing the evaluation(s).
(3)
Existing POWTS Evaluation Reports must be submitted to the Planning and Zoning Department within 30 days of completion of the evaluation.
(4)
When there is more than one private sewage system on a parcel a separate existing POWTS evaluation report shall be submitted for each system.
Existing POWTS Evaluation Reports.
(1)
When an evaluation of an existing POWTS is required by this ordinance, an existing POWTS Evaluation Report shall be completed which shall include all of the following:
(a)
A Soil and Site Evaluation Report verifying that the vertical separation distance between the infiltrative surface of the existing treatment or dispersal component and estimated high groundwater and/or bedrock complies with Wis. Admin. Code ch. SPS 383. Submittal of a soil and site evaluation report may not be required if:
1.
The existing POWTS is a code compliant holding tank; or
2.
A Soil and Site Evaluation Report, which is not a percolation test, is on file which was submitted to and approved by the Administrator maybe required based on site conditions. The County may accept older Soil and Site Evaluation Reports on a case by case basis.
(b)
A report provided by a plumber, certified septage servicing operator, certified POWTS inspector or other person(s) authorized to do so by Wis. Admin. Code ch. SPS 383, relative to the condition, capacities, and code compliance of any existing treatment or holding tanks.
(c)
A report provided by a plumber, certified POWTS inspector, or other person(s) authorized to do so by Wis. Admin. Code ch. SPS 383, relative to the condition, capacities, and code compliance of all other system components.
(d)
A plot plan prepared by a plumber, certified soil tester, certified POWTS inspector, or other person(s) authorized to do so by Wis. Admin. Code ch. SPS 383, including information specified in section 7.9.15(4)(c) of this ordinance, unless an accurate plot plan is on file with the Planning and Zoning Department.
(e)
An evaluation of the use and wastewater flow of the structure(s) served relative to the capacity of the existing POWTS.
(f)
Verification that all domestic wastewater from the structure discharges into the POWTS.
(2)
Existing POWTS Evaluation Reports must be on forms provided by or in a format approved by the Planning and Zoning Department. Existing POWTS Evaluation Reports must be signed by the licensed or certified person(s) performing the evaluation(s).
(3)
Existing POWTS Evaluation Reports must be submitted to the Planning and Zoning Department within 30 days of completion of the evaluation.
(4)
When there is more than one private sewage system on a parcel a separate existing POWTS evaluation report shall be submitted for each system.