Inspections; General.
(1)
Notice for inspection shall be made with the Administrator for all POWTS installed, replaced, repaired, modified or reconnected.
(2)
These POWTS shall be inspected by the Administrator for compliance with Wis. Admin. Code chs. SPS 382, SPS 383, and SPS 384, other appropriate Wisconsin Statutes and Administrative Codes and this ordinance.
(3)
Notification for inspection shall be given in accordance with the requirements of Wis. Admin. Code ch. SPS 383.
(4)
The entire POWTS shall be left completely open until it has been inspected and accepted, unless the requirements of Wis. Admin. Code ch. SPS 383, are not met by the County. If system has to partially backfilled, the plumber must contact department for approval.
(5)
When a POWTS is ready for inspection, the plumber in charge shall make arrangements to enable the Administrator to inspect all parts of the system. The plumber shall provide the proper apparatus, equipment and necessary assistance to make a proper inspection.
(6)
POWTS may be inspected periodically, after the initial installation inspection(s) and/or after the system is operative, as deemed necessary by the Planning and Zoning Department.
Inspections; General.
(1)
Notice for inspection shall be made with the Administrator for all POWTS installed, replaced, repaired, modified or reconnected.
(2)
These POWTS shall be inspected by the Administrator for compliance with Wis. Admin. Code chs. SPS 382, SPS 383, and SPS 384, other appropriate Wisconsin Statutes and Administrative Codes and this ordinance.
(3)
Notification for inspection shall be given in accordance with the requirements of Wis. Admin. Code ch. SPS 383.
(4)
The entire POWTS shall be left completely open until it has been inspected and accepted, unless the requirements of Wis. Admin. Code ch. SPS 383, are not met by the County. If system has to partially backfilled, the plumber must contact department for approval.
(5)
When a POWTS is ready for inspection, the plumber in charge shall make arrangements to enable the Administrator to inspect all parts of the system. The plumber shall provide the proper apparatus, equipment and necessary assistance to make a proper inspection.
(6)
POWTS may be inspected periodically, after the initial installation inspection(s) and/or after the system is operative, as deemed necessary by the Planning and Zoning Department.