22 Patio Home Zone PH
The purpose of the Patio Home Zone is to provide an acceptable housing style for single family “empty nest” type housing that is a sustainable quality product within Clinton City. The Zone is intended for infill use within the guidelines established within this Title. Development within any subdivision within the Zone is to be based upon an overall site design created by and developed completely by one developer and home builder.
TABLE 22.4.3 | |||
Dwelling Design | Rear Lot Patio | Side Lot Patio | Adjacent Zone |
Front of Dwelling Major Street As Described in the Clinton City Transportation Master Plan | Not Allowed | ||
Front | 20 | 20 | 20 |
Side w/o Side Patio | 5 / 5 |
| 8 / 5 |
Side with Side Patio |
| 5 / 16 | 8 / 16 |
Street Side | 16 / 5 | 16 / 16 | 16 / 16 |
Street Side Patio toward street |
| 21 / 5 |
|
Rear | 20 | 10 | 20 |
Patio Awning Unenclosed | Shall not extend into more than 1/2 of required setback | ||
Patio Awning Enclosed | Shall not extend into the required setback | ||
Accessory Building219 | The size and location of any accessory buildings shall be evaluated and approved during the approval process and shall be outlined in the development agreement and CC&R’s. Otherwise none allowed. | ||
Shed (Yard Shed) | Permitted when all zoning requirements of Chapter 28-3 (Section 28-3-25(5)) are met. | ||
Note: 5-foot side lots cannot be adjacent if fence is going to be part of the development design. | |||
| TABLE 22.4.4 | ||
| Main Building | Story | 1 story* |
| Height | 25 feet | |
| Accessory Building | Minimum | 6 feet |
| Maximum | 1 story or 15 feet** | |
| *Habitable attic space permitted over garage area. No alteration of roofline or dormers allowed. 211 ** Not to exceed height of main building on lot | ||
| TABLE 22.4.5 | |
| Minimum Dwelling Unit Square Footage | 1,430 |
| Minimum Finished Living Space | 1,430 |
| Minimum Garage Size | 2 car |
| Accessory Building | 400 sq. ft. maximum |
TABLE 22.4.6 | ||
Exterior | Front | 100% Brick, stone or fiber cement board |
| Sides | 100% Brick, stone or fiber cement board |
| Rear | 100% Brick, stone or fiber cement board |
Patio | Minimum | 200 square feet |
Landscaping and Automatic Sprinkler System | Installed with construction contract* | |
Park strip trees | 1 per frontage, 1.5 average per frontage* | |
Fencing | Standardized within development | |
Architecture | Consistent theme among all structures | |
*Developer shall pay a Landscape Cash Bond of $8,500, specifically for the landscape installation, at the time of issuance of the Building Permit. The normal landscape installation will be required within 30 days of the C/O issuance. However, when that 30 day period cannot be achieved due to the short secondary water season, the landscape shall be installed by or prior to the next May 15th. The entire Landscape Cash Bond amount shall be held by the City until final completion of the required landscaping. | ||
TABLE 22.4.7 | |
Maximum Acreage | 18 |
Maximum Density/Acre | 5 |
Maximum Lots | 90 |
Public Streets | Public |
Utilities | Public |
Street Design | Standard City Design |
Street Lights | City Design |
All developments within the Zone shall have a Homeowners Association established with Conditions, Covenants and Restrictions (CC&R’s). CC&R’s, at a minimum, are to establish the requirements of this Chapter, the Development Agreement and CC&R’s shall be consistent between all phases of the development and apply equally to all property owners.
A Patio Home Infill development may create a development agreement during the approval process. If a development agreement is used, it will outline the design requirements and stipulations established between the developer and city. The agreement shall be recorded against the property and be binding upon the developer and future owners of property within the development.
22 Patio Home Zone PH
The purpose of the Patio Home Zone is to provide an acceptable housing style for single family “empty nest” type housing that is a sustainable quality product within Clinton City. The Zone is intended for infill use within the guidelines established within this Title. Development within any subdivision within the Zone is to be based upon an overall site design created by and developed completely by one developer and home builder.
TABLE 22.4.3 | |||
Dwelling Design | Rear Lot Patio | Side Lot Patio | Adjacent Zone |
Front of Dwelling Major Street As Described in the Clinton City Transportation Master Plan | Not Allowed | ||
Front | 20 | 20 | 20 |
Side w/o Side Patio | 5 / 5 |
| 8 / 5 |
Side with Side Patio |
| 5 / 16 | 8 / 16 |
Street Side | 16 / 5 | 16 / 16 | 16 / 16 |
Street Side Patio toward street |
| 21 / 5 |
|
Rear | 20 | 10 | 20 |
Patio Awning Unenclosed | Shall not extend into more than 1/2 of required setback | ||
Patio Awning Enclosed | Shall not extend into the required setback | ||
Accessory Building219 | The size and location of any accessory buildings shall be evaluated and approved during the approval process and shall be outlined in the development agreement and CC&R’s. Otherwise none allowed. | ||
Shed (Yard Shed) | Permitted when all zoning requirements of Chapter 28-3 (Section 28-3-25(5)) are met. | ||
Note: 5-foot side lots cannot be adjacent if fence is going to be part of the development design. | |||
| TABLE 22.4.4 | ||
| Main Building | Story | 1 story* |
| Height | 25 feet | |
| Accessory Building | Minimum | 6 feet |
| Maximum | 1 story or 15 feet** | |
| *Habitable attic space permitted over garage area. No alteration of roofline or dormers allowed. 211 ** Not to exceed height of main building on lot | ||
| TABLE 22.4.5 | |
| Minimum Dwelling Unit Square Footage | 1,430 |
| Minimum Finished Living Space | 1,430 |
| Minimum Garage Size | 2 car |
| Accessory Building | 400 sq. ft. maximum |
TABLE 22.4.6 | ||
Exterior | Front | 100% Brick, stone or fiber cement board |
| Sides | 100% Brick, stone or fiber cement board |
| Rear | 100% Brick, stone or fiber cement board |
Patio | Minimum | 200 square feet |
Landscaping and Automatic Sprinkler System | Installed with construction contract* | |
Park strip trees | 1 per frontage, 1.5 average per frontage* | |
Fencing | Standardized within development | |
Architecture | Consistent theme among all structures | |
*Developer shall pay a Landscape Cash Bond of $8,500, specifically for the landscape installation, at the time of issuance of the Building Permit. The normal landscape installation will be required within 30 days of the C/O issuance. However, when that 30 day period cannot be achieved due to the short secondary water season, the landscape shall be installed by or prior to the next May 15th. The entire Landscape Cash Bond amount shall be held by the City until final completion of the required landscaping. | ||
TABLE 22.4.7 | |
Maximum Acreage | 18 |
Maximum Density/Acre | 5 |
Maximum Lots | 90 |
Public Streets | Public |
Utilities | Public |
Street Design | Standard City Design |
Street Lights | City Design |
All developments within the Zone shall have a Homeowners Association established with Conditions, Covenants and Restrictions (CC&R’s). CC&R’s, at a minimum, are to establish the requirements of this Chapter, the Development Agreement and CC&R’s shall be consistent between all phases of the development and apply equally to all property owners.
A Patio Home Infill development may create a development agreement during the approval process. If a development agreement is used, it will outline the design requirements and stipulations established between the developer and city. The agreement shall be recorded against the property and be binding upon the developer and future owners of property within the development.