PLACING OR ERECTION OF TRAILERS, TRUCKS, OR TEMPORARY BUILDINGS, SHEDS OR OFFICES.
1. Permit Required. No person shall, unless first obtaining approval of a permit from the Council, place, park, or erect any trailer, truck, or temporary building, shed or office on any lot for the purpose of storing merchandise, commodities, materials, products or conducting sales therefrom when the placing, parking or erection of the same is used in connection with any commercial or industrial building.
2. Permit Information. Any person requesting a permit required under subsection 1 must state the type of trailer, or temporary building, office or shed to be placed, parked or erected upon the lot, the nature or purpose of the use therefor and the length of time that it will remain on the lot.
3. Use of Existing Trailer, Truck, or Temporary Building, Shed or Office; Permit Required. A permit shall not be required by all persons who at the time of the enactment of this chapter, are using any trailer, truck, or temporary building, shed or office as set out in Subsection 1.
4. Exceptions. Nothing contained in Subsections 1 and 3 shall prohibit the loading or unloading of any trailer, truck, or temporary building, shed or office on any lot providing the loading or unloading is completed within 12 hours and the trailer, truck, or temporary building, shed or office is promptly removed thereafter.
Dallas Center City Zoning Code
165.42 PARKING
PLACING OR ERECTION OF TRAILERS, TRUCKS, OR TEMPORARY BUILDINGS, SHEDS OR OFFICES.
1. Permit Required. No person shall, unless first obtaining approval of a permit from the Council, place, park, or erect any trailer, truck, or temporary building, shed or office on any lot for the purpose of storing merchandise, commodities, materials, products or conducting sales therefrom when the placing, parking or erection of the same is used in connection with any commercial or industrial building.
2. Permit Information. Any person requesting a permit required under subsection 1 must state the type of trailer, or temporary building, office or shed to be placed, parked or erected upon the lot, the nature or purpose of the use therefor and the length of time that it will remain on the lot.
3. Use of Existing Trailer, Truck, or Temporary Building, Shed or Office; Permit Required. A permit shall not be required by all persons who at the time of the enactment of this chapter, are using any trailer, truck, or temporary building, shed or office as set out in Subsection 1.
4. Exceptions. Nothing contained in Subsections 1 and 3 shall prohibit the loading or unloading of any trailer, truck, or temporary building, shed or office on any lot providing the loading or unloading is completed within 12 hours and the trailer, truck, or temporary building, shed or office is promptly removed thereafter.