Zoneomics Logo
search icon

Kuna City Zoning Code

5-8-1127

- AMENDMENTS TO THE FINAL DEVELOPMENT PLAN:

A.

Any subsequent amendment to the final development plan changing location, siting and height of buildings and structures may be authorized by the Commission without additional public hearings, if required by engineering or other circumstances not foreseen at the time the final plan was approved. In no case shall the Commission authorize changes without additional public hearings, which may cause any of the following:

1.

A change in the use or character of the development, including ownership.

2.

An increase in overall coverage of structures or significant changes in types of structures.

3.

An increase of the intensity of use or types of usage.

4.

An increase in the problems of traffic circulation and public utilities.

5.

A reduction of off-street parking and loading space.

6.

A reduction in required pavement widths.

B.

All other changes in use, rearrangement of lots, blocks and building tracts, or in the provision of common open spaces and changes in addition to those listed above, which constitute substantial alteration of the original plan shall require a public hearing before the Commission and approval by the Council.

(Ord. No. 2024-06, § 2, 4-16-2024)