A. All work being performed within city right-of-way is subject to city inspection or inspection by a representative of the city who works for a third party. The telecommunications provider's contractor shall notify adjacent residents and businesses of the proposed work and make accommodations to maintain access to the properties affected by construction activities.
B. Contractor shall ensure that any open trenches are protected to prevent accidental ingress by people or vehicles. Trenches may not be left open without active work in them for more than three (3) consecutive days.
C. Contractor will provide the city with detailed compaction reports for all backfill activities.
D. Unless stated otherwise in the permit, the permit is granted for ninety (90) calendar days, and all work must be completed in that time. The applicant or permittee may apply for an extension. Any work, repairs, or remediation not completed in time shall be subject to a weekly inspection fee until work has been completed to the satisfaction of the city. Failure to timely complete the permitted work may also be a cause for revoking a permit.
E. Failure to abide by any of the terms and conditions of a permit or of any associated agreement is considered due cause for revoking a permit.
F. Permittee shall file, at least monthly, a statement of system construction and build-out to date, and as-built maps of underground and aerial build-out and per linear foot distances and locations in a GIS format acceptable to the city. Upon final completion of the project, which shall include full restoration and the period of retained security, permittee shall file complete as-builts for the telecommunication facilities constructed as well as maps, aerial build-out and per linear foot distance and the location in an electronic format specified and acceptable to the city. Then filing under this provisions ceases.
G. A telecommunications provider may have up to six (6) open permits in process at one (1) time. Where the maximum number of city-approved permits are open, the city will not approve a new permit until complete restoration of the right-of-way, sidewalks, curbs and gutters occurs, and, to the extent applicable, work is done on affected private property.
H. The telecommunications provider will reimburse the city for the fees, costs and expenses incurred by the city for application reviews, plan reviews, review and administration of applicable permits, testing and inspection within city rights-of-way and project work on other city-owned property. This includes, by way of illustration and not limitation, correct plant mix; pavement placement; sidewalk replacement; landscaping repair including sod, irrigation lines, sprinklers, shrubs, and trees; traffic control set up; street restoration; graffiti removal; clean-up and public safety. The city will provide the telecommunications provider written notice of what needs to be repaired, and give thirty (30) days to remediate. If not remediated by the deadline, the telecommunications provider shall reimburse such fees, costs and expenses within thirty (30) days after written demand (i.e. an invoice) from the city.
I. To the extent practicable and economically feasible, the construction and location of facilities shall be of minimal impact to private property including, but not limited to, yards and fences. All construction and maintenance of any and all facilities on private property shall, regardless of who performs the construction, be and remain the responsibility of the telecommunications provider. Prior to beginning any construction, permittee shall provide private property owners with a door hanger or other appropriate written notice at least five (5) calendar days before commencing work and a construction schedule for work on private property. The contractor shall not leave gates open, or hop fences, or leave yards in disarray.
J. When any opening is made in a yard on private property or fences are disturbed, such shall be promptly restored to as good or better condition than that existing before the work commenced. If the permittee fails to complete the work referred to herein within the time prescribed and to the city's satisfaction, the city may cause such work to be done and bill the cost of the work to the telecommunications provider. Payment shall be remitted to the city within ten (10) business days of receipt of an itemized list of those costs. All of the work shall be done by a permittee in compliance with all laws, regulations and ordinances of the City and State of Montana.
K. The transmission and distribution system, wires and appurtenances of the telecommunications provider shall be located, installed and maintained so as not to endanger or interfere with the lives of persons, or to unnecessarily hinder or obstruct the free use of private property, rights-of-way, or other public property.
L. Unless a written exception is granted in the permit, all telecommunications facilities shall be located at least three (3) vertical and horizontal feet from all existing or planned water and sewer facilities.
(Ord. 413-2026, 2-10-2026)