21-9.7 Performance

guarantees.

[Ord. No. 04-12 § 21-9.7]
a. 
Before recording of final subdivision plats or as a condition of final site plan approval or as a condition to the issuance of a zoning permit pursuant to Subsection d of § 52 of P.L. 1975, c. 291 (N.J.S.A. 40:55D-65), the approving authority may require and shall accept in accordance with the standards adopted by ordinance for the purpose of assuring the installation and maintenance of on-tract improvements.
b. 
The furnishing of a performance guarantee in favor of the municipality in an amount not to exceed 120% of the cost of installation, which cost shall be determined by the Municipal Engineer according to the method of calculation set forth in § 15 of P.L. 1991, c. 256 (N.J.S.A. 40:55D-53.4), for improvements which the approving authority may deem necessary or appropriate. The Municipal Engineer shall prepare an itemized cost estimate of the improvements covered by the performance guarantee, which itemized cost estimate shall be appended to each performance guarantee posted by the obligor.
c. 
Provision for a maintenance guarantee to be posted with the governing body for a period not to exceed two years after final acceptance of the improvement, in an amount not to exceed 15% of the cost of the improvement, which cost shall be determined by the Municipal Engineer according to the method of calculation set forth in § 15 of P.L. 1991, c. 256 (N.J.S.A. 40:55D-53.4). In the event that other governmental agencies or public utilities automatically will own the utilities to be installed or the improvements are covered by a performance or maintenance guarantee to another governmental agency, no performance or maintenance guarantee, as the case may be, shall be required by the municipality for such utilities or improvements.
d. 
The time allowed for installation of the improvements for which the performance guarantee has been provided may be extended by the governing body by resolution. As a condition or as part of any such extension, the amount of any performance guarantee shall be increased or reduced, as the case may be, to an amount not to exceed 120% of the cost of the installation, which cost shall be determined by the Municipal Engineer according to the method of calculation set forth in § 15 of P.L. 1991, c. 256 (N.J.S.A. 40:55D-53.4), as of the time of the passage of the resolution.