Off-Street Parking and Loading
Gross Floor Area (square feet) | Number of Spaces Required | |
|---|---|---|
1,000 - 40,000 | 1 | |
40,000- 100,000 | 2 | |
100,000- 160,000 | 3 | |
160,000- 240,000 | 4 | |
240,000 - 320,000 | 5 | |
320,000 - 400,000 | 6 | |
Each 90,000 above 400,000 | 1 |
Level 1 operates on a fifteen- to twenty-amp breaker on a 120-volt AC circuit. |
Level 2 operates on a forty- to 100-amp breaker on a 208- or 240-volt AC circuit. |
Direct-current fast charger (DCFC) operates on a sixty-amp or higher breaker on a 480-volt or higher three-phase circuit with special grounding equipment. DCFC stations can also be referred to as "rapid charging stations" that are typically characterized by industrial-grade electrical outlets that allow for faster recharging of electric vehicles. |
Off-Street Parking and Loading
Gross Floor Area (square feet) | Number of Spaces Required | |
|---|---|---|
1,000 - 40,000 | 1 | |
40,000- 100,000 | 2 | |
100,000- 160,000 | 3 | |
160,000- 240,000 | 4 | |
240,000 - 320,000 | 5 | |
320,000 - 400,000 | 6 | |
Each 90,000 above 400,000 | 1 |
Level 1 operates on a fifteen- to twenty-amp breaker on a 120-volt AC circuit. |
Level 2 operates on a forty- to 100-amp breaker on a 208- or 240-volt AC circuit. |
Direct-current fast charger (DCFC) operates on a sixty-amp or higher breaker on a 480-volt or higher three-phase circuit with special grounding equipment. DCFC stations can also be referred to as "rapid charging stations" that are typically characterized by industrial-grade electrical outlets that allow for faster recharging of electric vehicles. |