When an owner of a solar energy system has been notified to remove same and has not done so six months after receiving said notice, then the Borough may remove such system and place a lien upon the property for the cost of the removal. If removed by the owner, a demolition permit shall be obtained and the facility shall be removed. Upon removal, the site shall be cleaned, restored and revegetated to blend with the existing surrounding vegetation at the time of abandonment.