Zoneomics Logo
search icon

Hopewell City Zoning Code

§ 12-17B.7

Requirements for First Priority Locations.

a. 
The location of wireless communication antennas on or within the structures in Hopewell Borough identified in Addendum I[1] shall be considered permitted uses and shall require site plan review and approval of a submitted application by the Hopewell Borough Planning Board in accordance with Chapter 13, Site Plan Review, of the Revised General Ordinances of the Borough of Hopewell.
[1]
Editor's Note: Addendum I, referred to herein is included as an attachment to this chapter.
b. 
In addition to the information otherwise required for site plans as identified on the borough's development application checklist, the applicant shall provide the following information to the planning board:
1. 
Any proposed structural modification to the existing tower, tank, cupola, steeple or silo that is necessary to accommodate the proposed antennas, provided that the height of the existing structure shall not be increased;
2. 
Details of the proposed antennas, which shall be flush-mounted antennas totaling no more than six in number;
3. 
The proposed location and landscape screening of any shelters enclosing the related electronic equipment;
4. 
Any other construction that may be proposed or required regarding the installation of the proposed antennas; and
5. 
The height of any proposed antenna attached to an existing structure, provided that no antenna shall extend higher than 10 feet above the height of the existing structure.