§ 13-24.16

Sand and Gravel Processing Facilities as Part of a Soil Removal Operation.

a. 
The minimum tract size shall be 20 acres.
b. 
The processing facilities may include washing, crushing, sifting, stockpiling and loading facilities.
c. 
No operation involving a processing facility shall be carried out within 100 feet of a residence or 50 feet from a boundary line, whichever is greater.
d. 
All processing facilities shall be operated only between the hours of 7:00 a.m. and 7:00 p.m.
e. 
The maximum noise level measured at the property line shall be:
Frequency Band in Cycles Per Second
Second-Pressure Level Decibels re 0.0002 dyne/cm 2
20-75
75
75-150
60
150-300
54
300-600
48
600-1,200
45
1,200-2,400
42
2,400-4,800
39
Above 4,800
36
f. 
The maximum height of any equipment or material stockpiled used in sand and gravel operations shall not exceed the maximum height of 40 feet.