Topsoil shall not be removed from the tract during construction, but shall be stored and redistributed on the site. Topsoil shall be regraded on site to a minimum depth of four inches. After regrading, inspection and approval of the township engineer, excess topsoil may be removed from the site. Such areas shall be stabilized by seeding or planting in accordance with the approved landscaping plan.