The minimum setback of the tower from any property line within the P-1 zone shall be equal to or greater than 10 feet from a property line and shall be equal to or greater than 25 feet from a street right-of-way line.
P-1 Zone. The maximum lot coverage of any wireless communication tower and equipment cabinets and/or structures within the P-1 zone shall be limited to 10% of the lot area.
I-Institutional Zone. The maximum lot coverage of any wireless communication tower and equipment cabinets and/or structures within the I-Institutional zone shall be limited to 8% of the lot area.
The site on which the tower and any accessory buildings or structures are situated shall be completely enclosed with a fence at least six feet high, of composition meeting the approval of the Planning Board, which shall include a locking security gate and an appropriate anticlimbing device, provided that the municipal board having jurisdiction may waive or modify such requirement as it deems appropriate.
A landscape buffer shall be provided around a tower facility located on a lot. This requirement may be waived by the approving authority where deemed appropriate.
The cabinet or structure shall not contain more than 400 square feet of gross floor area or be more than 12 feet in height. The maximum requirement of 400 square feet of gross floor area shall be limited to the equipment cabinet of one wireless communication user. In addition, the cabinet or structure shall not exceed the maximum allowable height for the buildings in the zone district in which the antenna is located.
If the equipment structure is located on the roof of a building, the area of the equipment structure and other equipment and structures, whether associated with the antennas or for other purposes, shall not occupy more than 50% of the roof top area.
All building mounted antennas, used for the transmission of signals, shall be installed with a safety interruption device, capable of stopping antenna transmissions if any object comes within the signal path for more than 0.20 seconds.
Access to all building mounted antennas and supporting equipment shall be secured from the general public. The applicant shall install alarms on access hatches and doors or install protective fencing, as directed by the Construction Official.
Antennas Mounted on Utility Poles or Light Poles. The equipment cabinet or structure used in association with antennas shall be located in accordance with the following:
The equipment cabinet shall be screened by an evergreen hedge with an ultimate minimum height of eight feet and a planted height of at least five feet.
Minimum Lot Area. Minimum lot area and lot width for wireless communication towers in the I-Institutional zone is added to the ordinance as follows:
Minimum lot area and lot width for wireless communication towers in the I-Institutional zone shall be a minimum of 26,000 square feet for the minimum lot area and a minimum lot width of 200 feet.
At a tower site, the design of the buildings and related structures shall, to the extent possible, use materials, colors, textures, screening, and landscaping that will blend them into the natural setting and surrounding buildings.
If an antenna is installed on a structure other than a tower, the antenna and supporting electrical and mechanical equipment must be of a neutral color that is identical to, or closely compatible with, the color of the supporting structure so as to make the antenna and related equipment as visually unobtrusive as possible.
Lighting. Towers shall not be artificially lighted, unless required by the FAA or other applicable authority. If lighting is required, the lighting alternatives and design chosen must cause the least disturbance to the surrounding views.
The minimum setback of the tower from any property line within the P-1 zone shall be equal to or greater than 10 feet from a property line and shall be equal to or greater than 25 feet from a street right-of-way line.
P-1 Zone. The maximum lot coverage of any wireless communication tower and equipment cabinets and/or structures within the P-1 zone shall be limited to 10% of the lot area.
I-Institutional Zone. The maximum lot coverage of any wireless communication tower and equipment cabinets and/or structures within the I-Institutional zone shall be limited to 8% of the lot area.
The site on which the tower and any accessory buildings or structures are situated shall be completely enclosed with a fence at least six feet high, of composition meeting the approval of the Planning Board, which shall include a locking security gate and an appropriate anticlimbing device, provided that the municipal board having jurisdiction may waive or modify such requirement as it deems appropriate.
A landscape buffer shall be provided around a tower facility located on a lot. This requirement may be waived by the approving authority where deemed appropriate.
The cabinet or structure shall not contain more than 400 square feet of gross floor area or be more than 12 feet in height. The maximum requirement of 400 square feet of gross floor area shall be limited to the equipment cabinet of one wireless communication user. In addition, the cabinet or structure shall not exceed the maximum allowable height for the buildings in the zone district in which the antenna is located.
If the equipment structure is located on the roof of a building, the area of the equipment structure and other equipment and structures, whether associated with the antennas or for other purposes, shall not occupy more than 50% of the roof top area.
All building mounted antennas, used for the transmission of signals, shall be installed with a safety interruption device, capable of stopping antenna transmissions if any object comes within the signal path for more than 0.20 seconds.
Access to all building mounted antennas and supporting equipment shall be secured from the general public. The applicant shall install alarms on access hatches and doors or install protective fencing, as directed by the Construction Official.
Antennas Mounted on Utility Poles or Light Poles. The equipment cabinet or structure used in association with antennas shall be located in accordance with the following:
The equipment cabinet shall be screened by an evergreen hedge with an ultimate minimum height of eight feet and a planted height of at least five feet.
Minimum Lot Area. Minimum lot area and lot width for wireless communication towers in the I-Institutional zone is added to the ordinance as follows:
Minimum lot area and lot width for wireless communication towers in the I-Institutional zone shall be a minimum of 26,000 square feet for the minimum lot area and a minimum lot width of 200 feet.
At a tower site, the design of the buildings and related structures shall, to the extent possible, use materials, colors, textures, screening, and landscaping that will blend them into the natural setting and surrounding buildings.
If an antenna is installed on a structure other than a tower, the antenna and supporting electrical and mechanical equipment must be of a neutral color that is identical to, or closely compatible with, the color of the supporting structure so as to make the antenna and related equipment as visually unobtrusive as possible.
Lighting. Towers shall not be artificially lighted, unless required by the FAA or other applicable authority. If lighting is required, the lighting alternatives and design chosen must cause the least disturbance to the surrounding views.