4 FP FLOOD PLAIN DISTRICT
When the use proposed herein is allowable in a zoning district, the following uses and types of activities are permitted in the district; provided that such uses and types of activities do not entail any man-made changes to improved or unimproved real estate, including but not limited to buildings or other structures (including the placement of factory built buildings), mining, dredging, filling, grading, paving, excavation, or drilling operations.
The height, area, and parking requirements must conform to the district on which the Flood Plain District is superimposed.
The 2002 Flood Control Manual for the City of Muscatine, as amended, is hereby adopted by reference. Said Flood Control Manual shall have the same force and effect as though fully set forth herein. Copies of said Flood Control Manual are available in the office of the City Clerk.
Duties and responsibilities of the City Administrator or his/her designee, specifically relating to this Chapter, shall include, but not necessarily be limited to the following:
The Board of Adjustment may authorize upon request in specific cases such variances from the terms of this Ordinance that will not be contrary to the public interest where, owing to special conditions, a literal enforcement of the provisions of this Ordinance will result in unnecessary hardship. Variances granted must meet the following applicable standards.
Unless specifically defined below, words or phrases used in this ordinance shall be interpreted so as to give them the meaning they have in common usage and to give this ordinance its most reasonable application.
"Appurtenant Structure." A structure which is on the same parcel of the property as the principal structure to be insured and the use of which is incidental to the use of the principal structure.
"Base Flood Elevation." The elevation floodwaters would reach at a particular site during the occurrence of a base flood event.
"Basement." Any enclosed area of a building which has its floor or lowest level below ground level (subgrade) on all sides. Also see "lowest floor."
"Development." Any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations. “Development” does not include “minor projects” or “routine maintenance of existing buildings and facilities” as defined in this section. It also does not include gardening, plowing, and similar practices that do not involve filling or grading.
"Existing Construction." Any structure for which the “start of construction” commenced before the effective date of the first floodplain management regulations adopted by the community.
"Existing Factory-Built Home Park or Subdivision." A factory-built home park or subdivision for which the construction of facilities for servicing the lots on which the factory-built homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before August 25, 1981.
"Expansion of Existing Factory-Built Home Park or Subdivision." The preparation of additional sites by the construction of facilities for servicing the lots on which the factory-built homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads).
"Factory-Built Home." Any structure, designed for residential use, which is wholly or in substantial part, made, fabricated, formed or assembled in manufacturing facilities for installation or assembly and installation, on a building site. For the purpose of this Ordinance factory-built homes include mobile homes, manufactured homes and modular homes and also include park trailers, travel trailers and other similar vehicles placed on a site for greater than 180 consecutive days.
"Factory-Built Home Park." A parcel or contiguous parcels of land divided into two or more factory-built home lots for rent or sale.
"Flood." A general and temporary condition of partial or complete inundation of normally dry land areas resulting from the overflow of streams or rivers or from the unusual and rapid runoff of surface waters from any source.
"Flood Insurance Rate Map." The official map prepared as part of (but published separately from) the Flood Insurance Study which delineates both the flood hazard areas and the risk premium zones applicable to the community.
"Flood Insurance Study." A report published by FEMA for a community issued along with the community’s Flood Insurance Rate Map(s). The study contains such background data as the base flood discharge and water surface elevations that were used to prepare the FIRM.
"Flood Plain." Any land area susceptible to being inundated by water as a result of a flood.
"Flood Plain Management." An overall program of corrective and preventive measures for reducing flood damages and promoting the wise use of flood plains, including but not limited to emergency preparedness plans, flood control works, floodproofing and flood plain management regulations.
"Floodproofing." Any combination of structural and nonstructural additions, changes, or adjustments to structures, including utility and sanitary facilities, which will reduce or eliminate flood damage to such structures.
"Floodway." The channel of a river or stream and those portions of the floodplains adjoining the channel, which are reasonably required to carry and discharge flood waters or flood flows so that confinement of flood flows to the floodway area will not cumulatively increase the water surface elevation of the base flood by more than one (1) foot.
"Floodway Fringe." Those portions of the Special Flood Hazard Area outside the floodway.
"Highest Adjacent Grade." The highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure.
"Historic Structure." Any structure that is:
"Lowest Floor." The floor of the lowest enclosed area in a building including a basement except when all the following criteria are met:
In cases where the lowest enclosed area satisfies criteria A, B, C, and D above, the lowest floor is the floor of the next highest enclosed area that does not satisfy the criteria above.
"Maximum Damage Potential Development." Hospitals and like institutions; buildings or building complexes containing documents, data, or instruments of great public value; buildings or building complexes containing materials dangerous to the public or fuel storage facilities; power installations needed in emergency or other buildings or building complexes similar in nature or use.
"Minor Project." Small development activities (except for, filling, grading, and excavating) valued at less than $500.
"New Construction." Those structures or development for which the start of construction commenced on or after the effective date of the first floodplain management regulations adopted by the community.
"New Factory-Built Home Park or Subdivision." A factory-built home park or subdivision for which the construction of facilities for servicing the lots on which the factory-built homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after the effective date of first floodplain management regulations adopted by the community.
"100-Year Flood." A flood, the magnitude of which has a one percent chance of being equaled or exceeded in any given year or which, on the average, will be equaled or exceeded at least once every 100 years.
"Recreational Vehicle." A vehicle which is:
"Routine Maintenance of Existing Buildings and Facilities." Repairs necessary to keep a structure in a safe and habitable condition that do not trigger a building permit, provided they are not associated with a general improvement of the structure or repair of a damaged structure. Such repairs include:
"Substantial Damage." Damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damage condition would equal or exceed fifty (50) percent of the market value of the structure before the damage occurred. Volunteer labor and donated materials shall be included in the estimated cost of repair.
"Special Flood Hazard Area." The land subject to the "100-year flood". This land is identified as Zone A or AE on the Flood Insurance Rate Map for Muscatine County and Incorporated Areas, City of Muscatine, Panels 19139C0169D, 175D, 187D, 188D, 189D, 193D, 281D, 282D, and 301D, dated April 16, 2014; Panels 19139C0183D, and 191D, dated November 4, 2016; and Panels 19139C0179E, 184E, 185D, 192D, 225D, dated January 28, 2022; which were prepared as part of the Flood Insurance Study for Muscatine County.
"Start of Construction." Includes substantial improvement, and means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition, placement, or other improvement, was within 180 days of the permit date. The actual start means either the first placement or permanent construction of a structure on a site, such as pouring of a slab or footings, the installation of pile, the construction of columns, or any work beyond the stage of excavation; or the placement of a factory-built home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of the building, whether or not that alteration affects the external dimensions of the building.
"Structure." Anything constructed or erected on the ground or attached to the ground, including, but not limited to, buildings, factories, sheds, cabins, factory-built homes, storage tanks, grain storage facilities and/or other similar uses.
"Substantial Improvement." Any reconstruction, rehabilitation, addition, or other improvement of a structure, which satisfies following criteria:
The term does not, however, include either:
"Variance." A grant of relief by a community from the terms of the floodplain management regulations.
"Violation." The failure of a structure or other development to be fully compliant with the regulations contained in this chapter.
4 FP FLOOD PLAIN DISTRICT
When the use proposed herein is allowable in a zoning district, the following uses and types of activities are permitted in the district; provided that such uses and types of activities do not entail any man-made changes to improved or unimproved real estate, including but not limited to buildings or other structures (including the placement of factory built buildings), mining, dredging, filling, grading, paving, excavation, or drilling operations.
The height, area, and parking requirements must conform to the district on which the Flood Plain District is superimposed.
The 2002 Flood Control Manual for the City of Muscatine, as amended, is hereby adopted by reference. Said Flood Control Manual shall have the same force and effect as though fully set forth herein. Copies of said Flood Control Manual are available in the office of the City Clerk.
Duties and responsibilities of the City Administrator or his/her designee, specifically relating to this Chapter, shall include, but not necessarily be limited to the following:
The Board of Adjustment may authorize upon request in specific cases such variances from the terms of this Ordinance that will not be contrary to the public interest where, owing to special conditions, a literal enforcement of the provisions of this Ordinance will result in unnecessary hardship. Variances granted must meet the following applicable standards.
Unless specifically defined below, words or phrases used in this ordinance shall be interpreted so as to give them the meaning they have in common usage and to give this ordinance its most reasonable application.
"Appurtenant Structure." A structure which is on the same parcel of the property as the principal structure to be insured and the use of which is incidental to the use of the principal structure.
"Base Flood Elevation." The elevation floodwaters would reach at a particular site during the occurrence of a base flood event.
"Basement." Any enclosed area of a building which has its floor or lowest level below ground level (subgrade) on all sides. Also see "lowest floor."
"Development." Any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations. “Development” does not include “minor projects” or “routine maintenance of existing buildings and facilities” as defined in this section. It also does not include gardening, plowing, and similar practices that do not involve filling or grading.
"Existing Construction." Any structure for which the “start of construction” commenced before the effective date of the first floodplain management regulations adopted by the community.
"Existing Factory-Built Home Park or Subdivision." A factory-built home park or subdivision for which the construction of facilities for servicing the lots on which the factory-built homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before August 25, 1981.
"Expansion of Existing Factory-Built Home Park or Subdivision." The preparation of additional sites by the construction of facilities for servicing the lots on which the factory-built homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads).
"Factory-Built Home." Any structure, designed for residential use, which is wholly or in substantial part, made, fabricated, formed or assembled in manufacturing facilities for installation or assembly and installation, on a building site. For the purpose of this Ordinance factory-built homes include mobile homes, manufactured homes and modular homes and also include park trailers, travel trailers and other similar vehicles placed on a site for greater than 180 consecutive days.
"Factory-Built Home Park." A parcel or contiguous parcels of land divided into two or more factory-built home lots for rent or sale.
"Flood." A general and temporary condition of partial or complete inundation of normally dry land areas resulting from the overflow of streams or rivers or from the unusual and rapid runoff of surface waters from any source.
"Flood Insurance Rate Map." The official map prepared as part of (but published separately from) the Flood Insurance Study which delineates both the flood hazard areas and the risk premium zones applicable to the community.
"Flood Insurance Study." A report published by FEMA for a community issued along with the community’s Flood Insurance Rate Map(s). The study contains such background data as the base flood discharge and water surface elevations that were used to prepare the FIRM.
"Flood Plain." Any land area susceptible to being inundated by water as a result of a flood.
"Flood Plain Management." An overall program of corrective and preventive measures for reducing flood damages and promoting the wise use of flood plains, including but not limited to emergency preparedness plans, flood control works, floodproofing and flood plain management regulations.
"Floodproofing." Any combination of structural and nonstructural additions, changes, or adjustments to structures, including utility and sanitary facilities, which will reduce or eliminate flood damage to such structures.
"Floodway." The channel of a river or stream and those portions of the floodplains adjoining the channel, which are reasonably required to carry and discharge flood waters or flood flows so that confinement of flood flows to the floodway area will not cumulatively increase the water surface elevation of the base flood by more than one (1) foot.
"Floodway Fringe." Those portions of the Special Flood Hazard Area outside the floodway.
"Highest Adjacent Grade." The highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure.
"Historic Structure." Any structure that is:
"Lowest Floor." The floor of the lowest enclosed area in a building including a basement except when all the following criteria are met:
In cases where the lowest enclosed area satisfies criteria A, B, C, and D above, the lowest floor is the floor of the next highest enclosed area that does not satisfy the criteria above.
"Maximum Damage Potential Development." Hospitals and like institutions; buildings or building complexes containing documents, data, or instruments of great public value; buildings or building complexes containing materials dangerous to the public or fuel storage facilities; power installations needed in emergency or other buildings or building complexes similar in nature or use.
"Minor Project." Small development activities (except for, filling, grading, and excavating) valued at less than $500.
"New Construction." Those structures or development for which the start of construction commenced on or after the effective date of the first floodplain management regulations adopted by the community.
"New Factory-Built Home Park or Subdivision." A factory-built home park or subdivision for which the construction of facilities for servicing the lots on which the factory-built homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after the effective date of first floodplain management regulations adopted by the community.
"100-Year Flood." A flood, the magnitude of which has a one percent chance of being equaled or exceeded in any given year or which, on the average, will be equaled or exceeded at least once every 100 years.
"Recreational Vehicle." A vehicle which is:
"Routine Maintenance of Existing Buildings and Facilities." Repairs necessary to keep a structure in a safe and habitable condition that do not trigger a building permit, provided they are not associated with a general improvement of the structure or repair of a damaged structure. Such repairs include:
"Substantial Damage." Damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damage condition would equal or exceed fifty (50) percent of the market value of the structure before the damage occurred. Volunteer labor and donated materials shall be included in the estimated cost of repair.
"Special Flood Hazard Area." The land subject to the "100-year flood". This land is identified as Zone A or AE on the Flood Insurance Rate Map for Muscatine County and Incorporated Areas, City of Muscatine, Panels 19139C0169D, 175D, 187D, 188D, 189D, 193D, 281D, 282D, and 301D, dated April 16, 2014; Panels 19139C0183D, and 191D, dated November 4, 2016; and Panels 19139C0179E, 184E, 185D, 192D, 225D, dated January 28, 2022; which were prepared as part of the Flood Insurance Study for Muscatine County.
"Start of Construction." Includes substantial improvement, and means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition, placement, or other improvement, was within 180 days of the permit date. The actual start means either the first placement or permanent construction of a structure on a site, such as pouring of a slab or footings, the installation of pile, the construction of columns, or any work beyond the stage of excavation; or the placement of a factory-built home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of the building, whether or not that alteration affects the external dimensions of the building.
"Structure." Anything constructed or erected on the ground or attached to the ground, including, but not limited to, buildings, factories, sheds, cabins, factory-built homes, storage tanks, grain storage facilities and/or other similar uses.
"Substantial Improvement." Any reconstruction, rehabilitation, addition, or other improvement of a structure, which satisfies following criteria:
The term does not, however, include either:
"Variance." A grant of relief by a community from the terms of the floodplain management regulations.
"Violation." The failure of a structure or other development to be fully compliant with the regulations contained in this chapter.