Buildings and structures. The Construction Official shall make, or cause to be made, inspections for buildings and structures in flood hazard areas authorized by permit in accordance with the Uniform Construction Code, N.J.A.C. 5:23.
1. Lowest floor elevation. Upon placement of the lowest floor, including the basement, and prior to further vertical construction, certification of the elevation required in Subsection
19-10.8b shall be submitted to the Construction Official on an elevation certificate.
2. Lowest horizontal structural member. In V Zones and Coastal A Zones, upon placement of the lowest floor, including the basement, and prior to further vertical construction, certification of the elevation required in Subsection
19-10.8b shall be submitted to the Construction Official on an elevation certificate.
3. Installation of attendant utilities (electrical, heating, ventilating, air-conditioning, and other service equipment) and sanitary facilities elevated as discussed in Subsection
19-10.8b.
4. Final inspection. Prior to the final inspection, certification of the elevation required in Subsection
19-10.8b shall be submitted to the Construction Official on an elevation certificate.