§ 19-12A.9

Site Plan Submission Requirements.

In addition to the site plan submission requirements and other applicable requirements of Chapter XIX, the following information shall be submitted in conjunction with site plan approvals for all wireless telecommunications facilities:
a. 
Comprehensive Service Plan. In order to provide proper evidence that any proposed location of wireless telecommunications antennas (and any supporting tower and/or ancillary building enclosing related electronic equipment) has been planned to result in the fewest number of towers within the Borough of Point Pleasant Beach at the time full service is provided by the applicant throughout the Borough, the applicant shall submit a "comprehensive service plan." Said comprehensive service plan shall indicate how the applicant proposes to provide full service throughout the Borough and, to the greatest extent possible, said service plan shall also indicate how the applicant's plan is coordinated with the needs of all other providers of telecommunications services within the Borough of Point Pleasant Beach. The comprehensive service plan shall indicate the following:
1. 
Whether the applicant's subscribers can receive adequate service from antennas located outside of the borders of the Borough of Point Pleasant Beach.
2. 
How the proposed location of the antennas relates to the location of any existing towers within and/or near the Borough of Point Pleasant Beach.
3. 
How the proposed location of the antennas relates to the anticipated need for additional antennas and supporting towers within and/or near the Borough of Point Pleasant Beach by both the applicant and by other providers of telecommunications services within the Borough of Point Pleasant Beach.
4. 
How the proposed location of the antennas relates to the objective of collocating the antennas of different service carriers on the same tower.
5. 
How the proposed location of the antennas relates to the overall objective of providing full telecommunications services within the Borough of Point Pleasant Beach while, at the same time, limiting the number of towers to the fewest possible.
b. 
A scaled site plan clearly indicating the location, type and height of the proposed tower, on-site land uses and zoning, adjacent land uses and zoning (including when adjacent to other municipalities), and all properties within the applicable fall zone, adjacent roadways, proposed means of access, setbacks from property lines, elevation drawings of the proposed tower and any other structure, topography, parking and other information deemed by the approving authority to be necessary to assess compliance with this section.
c. 
Legal description of the entire tract and leased parcel (if applicable).
d. 
The setback distance between the proposed tower and the nearest residential unit and residentially zoned properties.
e. 
The separation distance from other towers and antennas.
f. 
A landscape plan showing specific landscape materials including, but not limited to species type, size, spacing and existing vegetation to be removed or retained.
g. 
Method of fencing and finished color and, if applicable, the method of camouflage.
h. 
A description of compliance with all applicable Federal, State or local laws.
i. 
A notarized statement by the applicant as to whether construction of the tower will accommodate collocation of additional antennas for future users.
j. 
Identification of the entities providing the backhaul network for the tower(s) described in the application and other telecommunications sites owned or operated by the applicant in the Borough.
k. 
A letter of commitment to lease excess space or other potential users at prevailing market rates and conditions. The letter of commitment shall be in form suitable for recording with the county clerk prior to the issuance of any permit and shall commit the tower owner(s), property owner(s) and their successors in interest.
l. 
A visual impact study containing, at a minimum, a photographic simulation showing the appearance of the proposed tower, antennas and ancillary facilities from at least five points within a three-mile radius. Such points shall be chosen by the carrier with review and approval by the Planning Board planning consultant to ensure that various potential views are represented.
m. 
An analysis of the peak RFR levels at the facility as a means of assessing compliance with the FCC RF safety criteria. This analysis shall:
1. 
Take into consideration all collocated radio transmitting antennas and/or nearby antennas that could contribute to RFR levels at the facility.
2. 
Be performed by an RF engineer, health physicist or similar knowledgeable individual using FCC approved and certified test equipment with a copy of the calibration certificate showing make, model and serial number.
3. 
Follow current methods recommended by the FCC for performing such analyses for use with the type of modulation of the RF carrier.