*Where a building lot has frontage on a street which the Master Plan or the Official Map of the Township or the Subdivision and Site Plan Resolution of the County of Ocean indicates is proposed for right-of-way widening or the street does not conform to the minimum right-of-way width requirements in this chapter or the above-indicated documents, the required front yard setback shall be measured from such required or proposed right-of-way line.
[Amended 9-24-1996 by Ord. No. 3196-96; 12-9-2003 by Ord. No. 3843-03]