Zoneomics Logo
search icon

Belton City Zoning Code

Appendix A

SCHEDULE OF FEES AND CHARGES1

[Adopted September 9, 2014] Updated May 2014 and August 2016

Application Type Filing Fees
Subdivision—Plan Reviews
Prelim. residential $200.00 for first 20 lots + $10.00/lot thereafter
Final residential $200.00 for first 20 lots + $10.00/lot thereafter
Prelim. commercial $300.00 for first 40 acres + $10.00/acre thereafter
Final commercial $300.00 for first 40 acres + $10.00/acre thereafter
Sign Permit
Permanent sign $50.00
Change of sign face $10.00
Temporary sign $15.00
Planning/Zoning
Rezoning—Residential $150.00
Rezoning—Comm., Mfg., PUD $200.00
Preliminary development plan $300.00
Final development plan $300.00
Special use $150.00
Variance $150.00
Lot split $150.00
Vacation $150.00
Building
Building permit fee (Based on valuation, calculated as per section 10-52, Unified Development Code) Minimum fee $42.00
Valuation $2,001.00 to $25,000.00 $42.00 for first $3,000.00 plus $7.40 for each additional $1,000.00 or fraction thereof, to and including $25,000.00
Valuation $25,001.00 to $50,000.00 $205.00 for first $25,000.00 plus $5.80 for each additional $1,000.00 or fraction thereof, to and including $50,000.00
Valuation $50,001.00 to $100,000.00 $350.00 for first $50,000.00 plus $5.50 for each additional $1,000.00 or fraction thereof, to and including $100,000.00
Valuation $100,001.00 to $500,000.00 $625.00 for first $100,000.00 plus $4.00 for each additional $1,000.00 or fraction thereof
Valuation $500,001.00 to $1,000,000.00 $2,225.00 for first $500,000.00 plus $4.00 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00
Valuation $1,000,001.00 and up $4,225.00 for first $1,000,000.00 plus $4.00 for each additional $1,000.00 or fraction thereof
Rental registration fee $20.00 per unit
Engineering
Arterial street impact fee $620.00/PM peak hour traffic trip (table attached)
Water impact fee Size displacement/turbine
¾" = $3,090.00
1" = $4,944.00
1.5" = $6,180.00/$9,888.00
2" = $12,360.00/$14,832.00
3" = $18,540.00/$33,867.00
4" = $24,670.00/$61,800.00
6" = $61,800.00/$135,960.00
Sanitary sewer impact fee Minimum $1,200.00 residential and $2,000.00 commercial
Dependent upon sewer district and meter size
Land disturbance permit No fee - except applicable public infrastructure fees
Service provider registration $19.00
Right-of-way permit $62.00
Street cut charge $24.00
Linear work charge $0.07/LF (2,000 LF per permit)
Re-inspection $24.00/re-inspection
Temporary Traffic Control Permit—Community Event $10.00/day
Temporary Traffic Control Permit—Arterial Street $24.00/lane/day
Temporary Traffic Control Permit—Collector Street $18.00/lane/day
Temporary Traffic Control Permit—Local Street $12.00/lane/day
Water tap $400.00 for ¾" meter
$482.00 for 1" meter
$540.00 for 1" tap w/dual ¾" meter
$892.00 for 1.5" meter
$1,120.00 for 2" meter
Larger meters at current material costs
Water deposit Builder = $110.00
Public Infrastructure
Engineering review and inspection fee 3% of the construction cost
Performance and 2-yr maintenance bond 100% of the construction cost
Fire
Plan review fee None
Operational permit fee None
Construction permit fee See building fees
Blasting permit $300.00

 

NOTES: Last updated October 2017

(Ord. No. 2014-4038, § 1, 9-9-2014; Ord. No. 2016-4256, § 1, 8-23-2016; Ord. No. 2017-4364, § 2, 6-13-2017; Ord. No. 2023-4800, § 1, 8-22-2023; Ord. No. 2023-4810 , § 1, 10-10-2023, eff. 7-1-2024)

Footnotes:
--- (1) ---

Editor's note—Ord. No. 2023-4800, § 1, adopted Aug. 22, 2023, repealed the former Appendix A, Part. I, and renumbered the former Appendix A, Part II as Appendix A. The former Part I pertained to the City of Belton Code of Ordinances fee schedule and derived from Ord. No. 2017-4319, § 1, adopted March 7, 2017. The historical notation for the Unified Development Code fee schedule has been retained for reference purposes.