SCHEDULE OF FEES AND CHARGES1
[Adopted September 9, 2014] Updated May 2014 and August 2016
| Application Type | Filing Fees |
|---|---|
| Subdivision—Plan Reviews | |
| Prelim. residential | $200.00 for first 20 lots + $10.00/lot thereafter |
| Final residential | $200.00 for first 20 lots + $10.00/lot thereafter |
| Prelim. commercial | $300.00 for first 40 acres + $10.00/acre thereafter |
| Final commercial | $300.00 for first 40 acres + $10.00/acre thereafter |
| Sign Permit | |
| Permanent sign | $50.00 |
| Change of sign face | $10.00 |
| Temporary sign | $15.00 |
| Planning/Zoning | |
| Rezoning—Residential | $150.00 |
| Rezoning—Comm., Mfg., PUD | $200.00 |
| Preliminary development plan | $300.00 |
| Final development plan | $300.00 |
| Special use | $150.00 |
| Variance | $150.00 |
| Lot split | $150.00 |
| Vacation | $150.00 |
| Building | |
| Building permit fee (Based on valuation, calculated as per section 10-52, Unified Development Code) | Minimum fee $42.00 |
| Valuation $2,001.00 to $25,000.00 | $42.00 for first $3,000.00 plus $7.40 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 |
| Valuation $25,001.00 to $50,000.00 | $205.00 for first $25,000.00 plus $5.80 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 |
| Valuation $50,001.00 to $100,000.00 | $350.00 for first $50,000.00 plus $5.50 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 |
| Valuation $100,001.00 to $500,000.00 | $625.00 for first $100,000.00 plus $4.00 for each additional $1,000.00 or fraction thereof |
| Valuation $500,001.00 to $1,000,000.00 | $2,225.00 for first $500,000.00 plus $4.00 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 |
| Valuation $1,000,001.00 and up | $4,225.00 for first $1,000,000.00 plus $4.00 for each additional $1,000.00 or fraction thereof |
| Rental registration fee | $20.00 per unit |
| Engineering | |
| Arterial street impact fee | $620.00/PM peak hour traffic trip (table attached) |
| Water impact fee | Size displacement/turbine |
| ¾" = $3,090.00 | |
| 1" = $4,944.00 | |
| 1.5" = $6,180.00/$9,888.00 | |
| 2" = $12,360.00/$14,832.00 | |
| 3" = $18,540.00/$33,867.00 | |
| 4" = $24,670.00/$61,800.00 | |
| 6" = $61,800.00/$135,960.00 | |
| Sanitary sewer impact fee | Minimum $1,200.00 residential and $2,000.00 commercial |
| Dependent upon sewer district and meter size | |
| Land disturbance permit | No fee - except applicable public infrastructure fees |
| Service provider registration | $19.00 |
| Right-of-way permit | $62.00 |
| Street cut charge | $24.00 |
| Linear work charge | $0.07/LF (2,000 LF per permit) |
| Re-inspection | $24.00/re-inspection |
| Temporary Traffic Control Permit—Community Event | $10.00/day |
| Temporary Traffic Control Permit—Arterial Street | $24.00/lane/day |
| Temporary Traffic Control Permit—Collector Street | $18.00/lane/day |
| Temporary Traffic Control Permit—Local Street | $12.00/lane/day |
| Water tap | $400.00 for ¾" meter |
| $482.00 for 1" meter | |
| $540.00 for 1" tap w/dual ¾" meter | |
| $892.00 for 1.5" meter | |
| $1,120.00 for 2" meter | |
| Larger meters at current material costs | |
| Water deposit | Builder = $110.00 |
| Public Infrastructure | |
| Engineering review and inspection fee | 3% of the construction cost |
| Performance and 2-yr maintenance bond | 100% of the construction cost |
| Fire | |
| Plan review fee | None |
| Operational permit fee | None |
| Construction permit fee | See building fees |
| Blasting permit | $300.00 |
NOTES: Last updated October 2017
(Ord. No. 2014-4038, § 1, 9-9-2014; Ord. No. 2016-4256, § 1, 8-23-2016; Ord. No. 2017-4364, § 2, 6-13-2017; Ord. No. 2023-4800, § 1, 8-22-2023; Ord. No. 2023-4810 , § 1, 10-10-2023, eff. 7-1-2024)
Editor's note—Ord. No. 2023-4800, § 1, adopted Aug. 22, 2023, repealed the former Appendix A, Part. I, and renumbered the former Appendix A, Part II as Appendix A. The former Part I pertained to the City of Belton Code of Ordinances fee schedule and derived from Ord. No. 2017-4319, § 1, adopted March 7, 2017. The historical notation for the Unified Development Code fee schedule has been retained for reference purposes.
SCHEDULE OF FEES AND CHARGES1
[Adopted September 9, 2014] Updated May 2014 and August 2016
| Application Type | Filing Fees |
|---|---|
| Subdivision—Plan Reviews | |
| Prelim. residential | $200.00 for first 20 lots + $10.00/lot thereafter |
| Final residential | $200.00 for first 20 lots + $10.00/lot thereafter |
| Prelim. commercial | $300.00 for first 40 acres + $10.00/acre thereafter |
| Final commercial | $300.00 for first 40 acres + $10.00/acre thereafter |
| Sign Permit | |
| Permanent sign | $50.00 |
| Change of sign face | $10.00 |
| Temporary sign | $15.00 |
| Planning/Zoning | |
| Rezoning—Residential | $150.00 |
| Rezoning—Comm., Mfg., PUD | $200.00 |
| Preliminary development plan | $300.00 |
| Final development plan | $300.00 |
| Special use | $150.00 |
| Variance | $150.00 |
| Lot split | $150.00 |
| Vacation | $150.00 |
| Building | |
| Building permit fee (Based on valuation, calculated as per section 10-52, Unified Development Code) | Minimum fee $42.00 |
| Valuation $2,001.00 to $25,000.00 | $42.00 for first $3,000.00 plus $7.40 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 |
| Valuation $25,001.00 to $50,000.00 | $205.00 for first $25,000.00 plus $5.80 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 |
| Valuation $50,001.00 to $100,000.00 | $350.00 for first $50,000.00 plus $5.50 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 |
| Valuation $100,001.00 to $500,000.00 | $625.00 for first $100,000.00 plus $4.00 for each additional $1,000.00 or fraction thereof |
| Valuation $500,001.00 to $1,000,000.00 | $2,225.00 for first $500,000.00 plus $4.00 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 |
| Valuation $1,000,001.00 and up | $4,225.00 for first $1,000,000.00 plus $4.00 for each additional $1,000.00 or fraction thereof |
| Rental registration fee | $20.00 per unit |
| Engineering | |
| Arterial street impact fee | $620.00/PM peak hour traffic trip (table attached) |
| Water impact fee | Size displacement/turbine |
| ¾" = $3,090.00 | |
| 1" = $4,944.00 | |
| 1.5" = $6,180.00/$9,888.00 | |
| 2" = $12,360.00/$14,832.00 | |
| 3" = $18,540.00/$33,867.00 | |
| 4" = $24,670.00/$61,800.00 | |
| 6" = $61,800.00/$135,960.00 | |
| Sanitary sewer impact fee | Minimum $1,200.00 residential and $2,000.00 commercial |
| Dependent upon sewer district and meter size | |
| Land disturbance permit | No fee - except applicable public infrastructure fees |
| Service provider registration | $19.00 |
| Right-of-way permit | $62.00 |
| Street cut charge | $24.00 |
| Linear work charge | $0.07/LF (2,000 LF per permit) |
| Re-inspection | $24.00/re-inspection |
| Temporary Traffic Control Permit—Community Event | $10.00/day |
| Temporary Traffic Control Permit—Arterial Street | $24.00/lane/day |
| Temporary Traffic Control Permit—Collector Street | $18.00/lane/day |
| Temporary Traffic Control Permit—Local Street | $12.00/lane/day |
| Water tap | $400.00 for ¾" meter |
| $482.00 for 1" meter | |
| $540.00 for 1" tap w/dual ¾" meter | |
| $892.00 for 1.5" meter | |
| $1,120.00 for 2" meter | |
| Larger meters at current material costs | |
| Water deposit | Builder = $110.00 |
| Public Infrastructure | |
| Engineering review and inspection fee | 3% of the construction cost |
| Performance and 2-yr maintenance bond | 100% of the construction cost |
| Fire | |
| Plan review fee | None |
| Operational permit fee | None |
| Construction permit fee | See building fees |
| Blasting permit | $300.00 |
NOTES: Last updated October 2017
(Ord. No. 2014-4038, § 1, 9-9-2014; Ord. No. 2016-4256, § 1, 8-23-2016; Ord. No. 2017-4364, § 2, 6-13-2017; Ord. No. 2023-4800, § 1, 8-22-2023; Ord. No. 2023-4810 , § 1, 10-10-2023, eff. 7-1-2024)
Editor's note—Ord. No. 2023-4800, § 1, adopted Aug. 22, 2023, repealed the former Appendix A, Part. I, and renumbered the former Appendix A, Part II as Appendix A. The former Part I pertained to the City of Belton Code of Ordinances fee schedule and derived from Ord. No. 2017-4319, § 1, adopted March 7, 2017. The historical notation for the Unified Development Code fee schedule has been retained for reference purposes.
