search icon

Nampa City Zoning Code

10-24-7

Primary structure or accessory structure rebuild letter.

A primary structure or accessory structure rebuild letter requires review and approval by the planning and zoning director or his/her designee. To be considered for a rebuild letter, the applicant shall provide a variance/rebuild application with all associated submittal materials. The following criteria shall apply to the review of any request for a rebuild letter:

1.

Literal interpretation and enforcement of the regulation would result in practical difficulty inconsistent with the objectives of this title.

2.

The granting of the rebuild letter will not constitute a grant of special privilege inconsistent with the area in which it is located.

3.

The granting of the rebuild letter will not be detrimental to the public health, safety or welfare or materially injurious to properties or improvements in the vicinity and in accordance with the rights afforded the owner of a lawful nonconforming use or structure.

A primary structure or accessory structure with a rebuild letter shall be allowed to be rebuilt on the existing foundation or footprint. The lot owner may work with the city to relocate the structure to more closely comply with any current setbacks with the written approval of the planning department director or his/her designee, and subject to other applicable city code provisions. If applicable, such relocation shall not remove the structure's status as a lawful nonconforming structure.

(Ord. No. 4702, § 1(Exh. A), 12-5-2022; Ord. No. 4777, § 1(Exh. A), 12-18-2023)