If the property on which a proposed development is to be located is or is proposed to be traversed by a drainage facility of any kind, including a pipe, channel, stream or swale, the planning board may require that a stormwater and drainage easement or right-of-way along said facility be provided by the developer. If existing land drainage structures, such as french drains, are encountered during the course of construction of any development, such drainage structures shall either be removed entirely or a revised final plat showing the location of such drainage structures and accompanied with detailed cross-sections thereof shall be filed with the borough engineer for consideration by the planning board. The planning board, after consulting its engineer and other appropriate agencies, shall either require a drainage easement, require that the structure be removed in part or in its entirety, or recommend such other action to the governing body as it deems appropriate.