Subbase and/or Aggregate Base Courses. Where granular subbase courses are included in the pavement design section proposed by the developer, they shall be constructed in accordance with the applicable requirements of the standard specifications. Bituminous concrete pavements (and stabilized bases) may be constructed on subgrade without subbase or aggregate base courses, provided that the subgrade can be satisfactorily prepared as described. Dense graded aggregate base courses shall comply with the requirements of the standard specifications for soil aggregate, Type 5, Class A, or Type 2, Class A or B.
Portland cement concrete pavements must be constructed with a minimum of six inches of a granular type subbase meeting the requirements of the standard specifications for soil aggregate, Type 4, Class E. Any subbase course of aggregate base course to be utilized with any type of pavement shall have a minimum thickness of four inches.