Table 8: Major Thoroughfare, 6 Lane Divided Cross-Section

Class ADT Range Cross-Section Bike Lanes Sidewalks Speed Limit (mph) ROW (feet) Approximate Construction Cost per Linear Foot*
Major Thoroughfare 12k+ 6 lane divided Yes Yes 45 134 $3,400
*Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW

 

AppC_Fig24

Table 9: Major Thoroughfare, 4 Lane Divided Cross-Section

Class ADT Range Cross-Section Bike Lanes Sidewalks Speed Limit (mph) ROW (feet) Approximate Construction Cost per Linear Foot*
Major Thoroughfare 12k+ 4 lane divided Yes Yes 45 110 $2,600
*Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW

 

AppC_Fig25

Table 10: Minor Thoroughfare, 4 Lane Divided Cross-Section

Class ADT Range Cross-Section Bike Lanes Sidewalks Speed Limit (mph) ROW (feet) Approximate Construction Cost per Linear Foot*
Minor Thoroughfare 9k—12k 4 lane divided Yes Yes 35 110 $2,600
*Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW

 

AppC_Fig26

Table 11: Minor Thoroughfare, 3 Lane Undivided Cross-Section

Class ADT Range Cross-Section Bike Lanes Sidewalks Speed Limit (mph) ROW (feet) Approximate Construction Cost per Linear Foot*
Minor Thoroughfare 6k—9k 3 lane undivided Yes Yes 35 79 $2,150
*Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW

 

AppC_Fig27

Table 12: Major Collector, 3 Lane Undivided Cross-Section

Class ADT Range Cross-Section Bike Lanes Sidewalks Speed Limit (mph) ROW (feet) Approximate Construction Cost per Linear Foot*
Major Collector 5k—6k 3 lane undivided Yes Yes 30 79 $2,150
*Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW

 

AppC_Fig28

Table 13: Major Collector, 2 Lane Divided Cross-Section

Class ADT Range Cross-Section Bike Lanes Sidewalks Speed Limit (mph) ROW (feet) Approximate Construction Cost per Linear Foot*
Major Collector 4k—5k 2 lane divided Yes Yes 30 86 $2,100
*Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW

 

AppC_Fig29

Table 14: Minor Collector, 2 Lane Undivided Cross-Section

Class ADT Range Cross-Section Bike Lanes Sidewalks Speed Limit (mph) ROW (feet) Approximate Construction Cost per Linear Foot*
Minor Collector 2k—4k 2 lane undivided Case-by-Case Yes 30 67 $1,800
*Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW

 

(Ord. No. O-20-2016, § 22, 11-14-2016; Ord. No. O-14-2017, § 1, Exh. 1, 5-8-2017; Ord. No. O-17-2019, § 5 (Exh. 1), 8-12-2019; Ord. No. O-06-2021, § 1, 2-22-2021)

Footnotes:
--- (2) ---

Editor's note—Ord. No. O-20-2016, § 1, adopted Nov. 14, 2016, amended the title of Appendix C to read as set out above. The complete ACS plan is available on the town website and at town hall.