ARTERIAL AND COLLECTOR STREET PLAN2
Table 8: Major Thoroughfare, 6 Lane Divided Cross-Section
| Class | ADT Range | Cross-Section | Bike Lanes | Sidewalks | Speed Limit (mph) | ROW (feet) | Approximate Construction Cost per Linear Foot* |
|---|---|---|---|---|---|---|---|
| Major Thoroughfare | 12k+ | 6 lane divided | Yes | Yes | 45 | 134 | $3,400 |
| *Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW | |||||||
Table 9: Major Thoroughfare, 4 Lane Divided Cross-Section
| Class | ADT Range | Cross-Section | Bike Lanes | Sidewalks | Speed Limit (mph) | ROW (feet) | Approximate Construction Cost per Linear Foot* |
|---|---|---|---|---|---|---|---|
| Major Thoroughfare | 12k+ | 4 lane divided | Yes | Yes | 45 | 110 | $2,600 |
| *Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW | |||||||
Table 10: Minor Thoroughfare, 4 Lane Divided Cross-Section
| Class | ADT Range | Cross-Section | Bike Lanes | Sidewalks | Speed Limit (mph) | ROW (feet) | Approximate Construction Cost per Linear Foot* |
|---|---|---|---|---|---|---|---|
| Minor Thoroughfare | 9k—12k | 4 lane divided | Yes | Yes | 35 | 110 | $2,600 |
| *Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW | |||||||
Table 11: Minor Thoroughfare, 3 Lane Undivided Cross-Section
| Class | ADT Range | Cross-Section | Bike Lanes | Sidewalks | Speed Limit (mph) | ROW (feet) | Approximate Construction Cost per Linear Foot* |
|---|---|---|---|---|---|---|---|
| Minor Thoroughfare | 6k—9k | 3 lane undivided | Yes | Yes | 35 | 79 | $2,150 |
| *Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW | |||||||
Table 12: Major Collector, 3 Lane Undivided Cross-Section
| Class | ADT Range | Cross-Section | Bike Lanes | Sidewalks | Speed Limit (mph) | ROW (feet) | Approximate Construction Cost per Linear Foot* |
|---|---|---|---|---|---|---|---|
| Major Collector | 5k—6k | 3 lane undivided | Yes | Yes | 30 | 79 | $2,150 |
| *Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW | |||||||
Table 13: Major Collector, 2 Lane Divided Cross-Section
| Class | ADT Range | Cross-Section | Bike Lanes | Sidewalks | Speed Limit (mph) | ROW (feet) | Approximate Construction Cost per Linear Foot* |
|---|---|---|---|---|---|---|---|
| Major Collector | 4k—5k | 2 lane divided | Yes | Yes | 30 | 86 | $2,100 |
| *Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW | |||||||
Table 14: Minor Collector, 2 Lane Undivided Cross-Section
| Class | ADT Range | Cross-Section | Bike Lanes | Sidewalks | Speed Limit (mph) | ROW (feet) | Approximate Construction Cost per Linear Foot* |
|---|---|---|---|---|---|---|---|
| Minor Collector | 2k—4k | 2 lane undivided | Case-by-Case | Yes | 30 | 67 | $1,800 |
| *Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW | |||||||
(Ord. No. O-20-2016, § 22, 11-14-2016; Ord. No. O-14-2017, § 1, Exh. 1, 5-8-2017; Ord. No. O-17-2019, § 5 (Exh. 1), 8-12-2019; Ord. No. O-06-2021, § 1, 2-22-2021)
Editor's note—Ord. No. O-20-2016, § 1, adopted Nov. 14, 2016, amended the title of Appendix C to read as set out above. The complete ACS plan is available on the town website and at town hall.
ARTERIAL AND COLLECTOR STREET PLAN2
Table 8: Major Thoroughfare, 6 Lane Divided Cross-Section
| Class | ADT Range | Cross-Section | Bike Lanes | Sidewalks | Speed Limit (mph) | ROW (feet) | Approximate Construction Cost per Linear Foot* |
|---|---|---|---|---|---|---|---|
| Major Thoroughfare | 12k+ | 6 lane divided | Yes | Yes | 45 | 134 | $3,400 |
| *Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW | |||||||
Table 9: Major Thoroughfare, 4 Lane Divided Cross-Section
| Class | ADT Range | Cross-Section | Bike Lanes | Sidewalks | Speed Limit (mph) | ROW (feet) | Approximate Construction Cost per Linear Foot* |
|---|---|---|---|---|---|---|---|
| Major Thoroughfare | 12k+ | 4 lane divided | Yes | Yes | 45 | 110 | $2,600 |
| *Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW | |||||||
Table 10: Minor Thoroughfare, 4 Lane Divided Cross-Section
| Class | ADT Range | Cross-Section | Bike Lanes | Sidewalks | Speed Limit (mph) | ROW (feet) | Approximate Construction Cost per Linear Foot* |
|---|---|---|---|---|---|---|---|
| Minor Thoroughfare | 9k—12k | 4 lane divided | Yes | Yes | 35 | 110 | $2,600 |
| *Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW | |||||||
Table 11: Minor Thoroughfare, 3 Lane Undivided Cross-Section
| Class | ADT Range | Cross-Section | Bike Lanes | Sidewalks | Speed Limit (mph) | ROW (feet) | Approximate Construction Cost per Linear Foot* |
|---|---|---|---|---|---|---|---|
| Minor Thoroughfare | 6k—9k | 3 lane undivided | Yes | Yes | 35 | 79 | $2,150 |
| *Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW | |||||||
Table 12: Major Collector, 3 Lane Undivided Cross-Section
| Class | ADT Range | Cross-Section | Bike Lanes | Sidewalks | Speed Limit (mph) | ROW (feet) | Approximate Construction Cost per Linear Foot* |
|---|---|---|---|---|---|---|---|
| Major Collector | 5k—6k | 3 lane undivided | Yes | Yes | 30 | 79 | $2,150 |
| *Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW | |||||||
Table 13: Major Collector, 2 Lane Divided Cross-Section
| Class | ADT Range | Cross-Section | Bike Lanes | Sidewalks | Speed Limit (mph) | ROW (feet) | Approximate Construction Cost per Linear Foot* |
|---|---|---|---|---|---|---|---|
| Major Collector | 4k—5k | 2 lane divided | Yes | Yes | 30 | 86 | $2,100 |
| *Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW | |||||||
Table 14: Minor Collector, 2 Lane Undivided Cross-Section
| Class | ADT Range | Cross-Section | Bike Lanes | Sidewalks | Speed Limit (mph) | ROW (feet) | Approximate Construction Cost per Linear Foot* |
|---|---|---|---|---|---|---|---|
| Minor Collector | 2k—4k | 2 lane undivided | Case-by-Case | Yes | 30 | 67 | $1,800 |
| *Approximate costs are for facilities on new location per linear foot of roadway centerline and do not include design or ROW | |||||||
(Ord. No. O-20-2016, § 22, 11-14-2016; Ord. No. O-14-2017, § 1, Exh. 1, 5-8-2017; Ord. No. O-17-2019, § 5 (Exh. 1), 8-12-2019; Ord. No. O-06-2021, § 1, 2-22-2021)
Editor's note—Ord. No. O-20-2016, § 1, adopted Nov. 14, 2016, amended the title of Appendix C to read as set out above. The complete ACS plan is available on the town website and at town hall.