A statement from the Township Engineer that he has received a map showing all utilities in exact location and elevation identifying those portions already installed and those to be installed, and that the developer has installed all improvements in accordance with all Township regulations, and/or a statement by the Township Clerk that proper performance guarantees have been posted with the Township Council for the installation of required improvements.