Abatement. After proper notification as provided in Section 30-35, the Planning Director or the Chief Building Inspector or their designated representatives may cause the closure of any building, place of assembly, or activity or may order the removal from the property of materials and structures which are in violation of this Chapter.
Recovery of Costs of Abatement. The costs incurred in the abatement of a violation may be charged to the owner of the property, the owner of the materials removed, or the occupant of the property.
Reinspection fee shall be $72 per inspection, after the initial inspection, if compliance is not met within the stipulated period. No reinspection fee shall be charged if compliance is obtained after the initial inspection.
Abatement. After proper notification as provided in Section 30-35, the Planning Director or the Chief Building Inspector or their designated representatives may cause the closure of any building, place of assembly, or activity or may order the removal from the property of materials and structures which are in violation of this Chapter.
Recovery of Costs of Abatement. The costs incurred in the abatement of a violation may be charged to the owner of the property, the owner of the materials removed, or the occupant of the property.
Reinspection fee shall be $72 per inspection, after the initial inspection, if compliance is not met within the stipulated period. No reinspection fee shall be charged if compliance is obtained after the initial inspection.