Compton City Zoning Code

§ 30-46.25

Building Permit.

[Ord. #2121, § 1]
An applicant shall apply for a building permit within 180 days of receiving a Conditional Use Permit for its PWSF. The Building Permit is to be based on drawings identical to:
a. 
Those submitted for approval under this section, or reflecting conditions of approval granted under this section.
b. 
The actual construction of the approved PWSF.
c. 
The construction shall be governed by the International Building Code, if applicable, or be certified by a professional engineer licensed by the State of California, that the design meets or exceeds the design standards for the use for which it is intended.