Surfacing. All loading areas shall be surfaced and maintained with a minimum thickness of two inches of asphalt on a minimum of four inches of aggregate base material or a minimum of four inches of Portland cement concrete or other approved permanent impervious surfacing material to prevent mud, dust, loose material, potholes or other nuisances. The ground to be paved shall be treated with a soil sterilizer prior to paving.