Uses permitted only upon approval of the zoning administrator.
1.
Places of Assembly locating into shopping centers or building(s) under 3,000 square feet subject to the following conditions:
a.
Maximum occupancy based on formulas contained in the Statewide Minimum Building Code (ICC; International Congress Code, with Georgia amendments).
b.
Fire and life safety compliance based on Inspection.
c.
Register with the City of Griffin Occupational Tax Permit (non-profit).
d.
Upon vacating this location for its principal site, the PAO will be voided.
2.
In making a determination as to whether or not an application for such use shall be approved at a particular time and location, the zoning administrator shall also consider the potential impacts, on existing or anticipated surrounding developments, Number of Parking and peak traffic impacts. Upon a finding that a particular use conforms to the intent and requirements of this section, the use may be approved by the zoning administrator.
3.
The administrative approval shall be for a period of two years and if the use is not in operation within six months the PAO will be voided.
Uses permitted only upon approval of the zoning administrator.
1.
Places of Assembly locating into shopping centers or building(s) under 3,000 square feet subject to the following conditions:
a.
Maximum occupancy based on formulas contained in the Statewide Minimum Building Code (ICC; International Congress Code, with Georgia amendments).
b.
Fire and life safety compliance based on Inspection.
c.
Register with the City of Griffin Occupational Tax Permit (non-profit).
d.
Upon vacating this location for its principal site, the PAO will be voided.
2.
In making a determination as to whether or not an application for such use shall be approved at a particular time and location, the zoning administrator shall also consider the potential impacts, on existing or anticipated surrounding developments, Number of Parking and peak traffic impacts. Upon a finding that a particular use conforms to the intent and requirements of this section, the use may be approved by the zoning administrator.
3.
The administrative approval shall be for a period of two years and if the use is not in operation within six months the PAO will be voided.