§ 25-25.2

Guarantee Reduction.

[Ord. No. 11/78; Ord. No. 5/24/82 § 1101]
The amount of any performance guarantee may be reduced by the Governing Body, by resolution, when portions of the improvements have been certified by the Municipal Engineer to have been completed. The time allowed for installation of the improvements for which the performance guarantee has been provided may be extended by the body by resolution.
a. 
If the required improvements are not completed or corrected in accordance with the performance guarantee, the obligor and surety, if any, shall be liable thereon to the municipality for the reasonable cost of the improvements not completed or corrected and the municipality may either prior to or after the receipt of the proceeds thereof complete such improvements.
b. 
When all of the required improvements have been completed, the obligor shall notify the Governing Body in writing, by certified mail addressed in care of the Municipal Clerk of the completion of the improvements and shall send a copy thereof to the Municipal Engineer. Thereupon the Municipal Engineer shall inspect all of the improvements and shall file a detailed report, in writing, with the Governing Body, indicating either approval, partial approval or rejection of the improvements with a statement of reasons for any rejection. If partial approval is indicated, the cost of the improvements rejected shall be set forth.
c. 
The Governing Body shall either approve, partially approve or reject the improvements, on the basis of the report of the Municipal Engineer and shall notify the obligor in writing, by certified mail, of the content of the report and the action of the approving authority with relation thereto, not later than 65 days after receipt, of the notice from the obligor of the completion of the improvements. Where partial approval is granted, the obligor shall be released from all liability pursuant to its performance guarantee, except for that portion adequately sufficient to secure provision of the improvements not yet approved. Failure of the Governing Body to send or provide such notification to the obligor within 65 days shall be deemed to constitute approval of the improvements and the obligor and surety, if any, shall be released from all liability pursuant to such performance guarantee.
d. 
If any portion of the required improvements are rejected, the approving authority may require the obligor to complete such improvements and, upon completion, the same procedure of notification, as set forth in this section shall be followed.
e. 
Nothing herein, however, shall be construed to limit the right of the obligor to contest by legal proceedings any determination of the Governing Body or the Municipal Engineer. The municipality shall return any balance of the inspection fee to the development applicant upon expiration of the maintenance bond, together with a statement of charges against this amount.
f. 
Prior to the Municipal Engineer making his final report and recommendations to the Borough Council, the developer will supply as-built plans, signed and sealed by a licensed New Jersey professional engineer showing surface grading including lot gradings, building finished floor grades and curb and gutter grades, together with horizontal and vertical location of underground facilities. Manholes, inlets and other such appurtenances together with sidewalks and curbs shall be shown in true location and grade. The as-built plans shall be submitted on reproducible media.
No certificate of occupancy shall be issued for any residential use unless and until the above as-built plans have been approved by the Municipal Engineer.