[Ord. No. O.1941-2016]
Height, area and yard requirements are as specified in the schedule, Section 37-63, except as otherwise specified in this section. The exceptions to that schedule include the following:
a.
Permitted building coverage ratio — 35%;
b.
Permitted impervious coverage ratio — 75%;