Transition Requirement. There shall be established along the line of any side or rear lot that is contiguous to any residential district, unless the side or rear lot line coincides with a State or Federal highway or railroad right-of-way, a buffer of at least fifty (50) feet in width plus five (5) feet additional width for each ten (10) foot interval or fraction thereof of the height of the proposed building exceeding twenty-five (25) feet. The buffer area shall be landscaped and fenced to provide screening of the operations of the lot from adjoining residential districts.