[Added 9-13-2022 by Ord. No. 2022-17]
A variance shall not be issued for any proposed development in a floodway when any increase in flood levels would result during the base flood discharge, as evidenced by the applicable analysis and certification required in Section
21-805A.3a of these regulations.