[1972 Code § 21-622]
Where a developer proposes detention or retention basins as part of a land development application, or where the Zoning Board or Planning Board recommends the construction or installation of a detention or retention basin, the developer's specific construction proposal shall be reviewed by the Township Engineer, or his designee, for public safety purposes; that review shall include considerations of signs, fences, outlet control, and/or other means to reduce the volume or velocity, as the case may be, of the flow of storm water run-off. The Township Engineer, or his designee shall submit written recommendations in accordance with generally accepted standards of design, from a public safety viewpoint, to the applicant and to the appropriate board. The Planning Board and the Zoning Board are hereby granted authority to approve detention or retention basins on such recommendation. See Plate B for design details. (Plate B, referred to herein, may be found on file in the Planning and Zoning Office.)