The shed area will not count as lot coverage provided that a minimum of eight inches of crushed stone is placed under the structure and two feet beyond the dripline.
The shed area will not count as lot coverage provided that a minimum of eight inches of crushed stone is placed under the structure and two feet beyond the dripline.